Orange County NC Website
future applications shall be required to meet applicable standards at the time of application except as <br /> modified herein or by proper Project Entitlement and/or Permitting Processes. <br /> 6. Applicant shall include internal and driveway improvements consistent with the November 21, 2024, <br /> Traffic Impact Analysis Review letter issued by C.N. Edwards, Jr., P.E., upon submittal of construction <br /> drawings for a driveway permit on Mt. Sinai Road associated with construction of the New Upper School. <br /> 7. Parcels 1, 2 and 3 will be combined into a single parcel within 24 months of expiration of the Klopfer <br /> Life Estate. <br /> 8. Approval of this zoning application is intended to include the existing uses and features allowed in the <br /> original Special Use Permit as modified. Upon approval of this zoning application, the Special Use Permit <br /> as modified is no longer necessary and shall be extinguished. <br /> Review Milestones <br /> Application Submittal Date January 30, 2025 <br /> Development Advisory Committee March 6, 2025 <br /> DAC Review <br /> Neighborhood Information Meeting May 7, 2025 <br /> NIM <br /> Note: The DAC is a staff/agency committee, established in Section 1.9 of the Unified <br /> Development Ordinance. <br /> Courtesy Review <br /> Jurisdiction Date Sent Comments Received (Y/N) <br /> State Clearing House February 18, 2025 Yes <br /> Town of Chapel Hill March 12, 2025 No <br /> All comments received through Courtesy Review are available via the Permit Portal. <br /> Analysis <br /> Staff Analysis <br /> As required under Section 2.8.5 of the LIDO, the Planning Director shall cause an analysis to be made <br /> of the application. In analyzing this request, the Planning Director offers a full analysis of the <br /> application's consistency with the adopted Orange County 2030 Comprehensive Plan. <br /> See the drafted Statement of Consistency (Attachment 7) in which the relevant Goals and Objectives of <br /> the Orange County 2030 Comprehensive Land Use Plan have been analyzed in full detail. <br /> 1. Staff review determined that the application is complete and all submitted materials are in <br /> compliance with the following applicable sections of the UDO: <br /> ■ Section 2.8, Zoning Atlas and Unified Development Ordinance Amendments <br /> ■ Section 2.9, Conditional Districts <br /> ■ Section 5.8.4, School Preparatory <br /> In accordance with Section 2.9.1(F), Approval and Conditions, the applicant has submitted <br /> conditions which are to be reviewed by the Board of County Commissioners for a determination as <br /> to whether such conditions will afford protection of the public health, safety, and general welfare. <br /> "School: Preparatory" is defined as Use #22 in the Table of Permitted Uses and within Article 10, <br /> Definitions of the UDO as: <br /> L-- 8 <br />