Orange County NC Website
Scope of Work Change order <br />1.Five (5) Siemens Smoke Detector and base. <br />2.Three (3)Siemens Wall Strobe <br />3.Three (3)Siemens Horn Strobe <br />4.Three (3) Door Relays <br />5.One (1) Siemens Tamper Switch <br />Exclusions and Clarifications <br />Work to be performed on regular time <br />Inclusions <br />1.Freight <br />2.Engineering <br />3.Project Management for Siemens Scope of work <br />4.Electrician <br />5.Supply or installation of any electrical conduits, cables, wiring or back boxes, and equipment <br />6.As interpreted in the specifications, as shown on drawings, and as defined in this proposal <br />7.One (1) year warranty <br />8.Final wiring terminations to the control panel <br />9.Programming <br />10.Testing <br />Page 5 of 11 <br />Docusign Envelope ID: 015115AB-A8FE-4204-85BF-10FBDEC70CDA