Orange County NC Website
Exclusions <br />1.Cost associated with multiple trips to the job site due to incompletion by others <br />2.Working in areas containing hazardous materials or confined space <br />3.Cost associated with schedule acceleration or multiple unplanned phases <br />4.Costs associated with bypassing the system during construction <br />5.Building and construction permit fees <br />6.Creating base building auto cad drawings for the project <br />7.Ceiling and/or wall removal, replacement, patching, and painting <br />8.Per project aggregate general liability insurance <br />9.Overtime <br />10.After hours work <br />11.DOL and additional testing due to others <br />12.Performance or payment bonds <br />13.Bonding or special insurance <br />14.Fire caulking <br />15.Scaffolding and lifts <br />16.Security system interface or door lock release <br />17.Fire Watch or other costs associated with temporary measures while the system is down or impaired <br />18.The proposal excludes all applicable taxes. Sales tax will not be included on the invoice unless Siemens <br />receives a completed NCDOR E589CI (North Carolina Affidavit of Capital Expenditures). We have <br />included an NCDOR E589CI form with this proposal for your convenienc <br />Page 6 of 10 <br />Docusign Envelope ID: B48BDDBA-8D3D-420F-8195-489C53DC15FC