Orange County NC Website
Scope of Work Change order <br />Customer requested additions: <br />1.Two (2) Siemens Addressable double action MPS isolation Pull Stations. <br />2.One (1) Siemens Wall Strobe <br />Exclusions and Clarifications <br />Work to be performed on regular time <br />Inclusions <br />1.Freight <br />2.Engineering <br />3.Project Management for Siemens Scope of work <br />4.Fire Alarm Permit associated with this project <br />5.Supply or installation of any electrical conduits, cables, wiring or back boxes, and equipment <br />6.One (1) year warranty <br />7.Final wiring terminations to the control panel <br />8.Programming <br />9.Electrical Install <br />10.Testing <br />Page 5 of 10 <br />Docusign Envelope ID: B48BDDBA-8D3D-420F-8195-489C53DC15FC