Browse
Search
Agenda 08-26-2025; 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 08-26-2025 Business Meeting
>
Agenda 08-26-2025; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 11:48:03 AM
Creation date
8/21/2025 11:56:37 AM
Metadata
Fields
Template:
BOCC
Date
8/26/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for August 26, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 08-26-2025 Business Meeting
Minutes 08-26-2025-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
ORD-2025-024-Bridge funding for residents displaced by tropical storm Chantal
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-075-Order of the board of county commissioners in accordance with G.S. 105-321
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-025-Labor Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-037-Tax Collector’s Annual Settlement for Fiscal Year 2024-25
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br /> 1 Slide #13 <br /> Proposed Conditions (Attachment 9) <br /> Per Section 2.9.1(F)(3)of the LIDO,the following conditions are being proposed: <br /> B. The storage facility's hours of operation shall not be before 6:00 am nor after9:O0 pm. <br /> 9. Outdoor I ighti ng fixtu res s hal I not exceed 25-feet in height from ground level. All lighting shall be <br /> downward to minimize Iighttrespass and obtrusive lighting. <br /> 10. The property owner shall record a final pi atdividingthe+/-11.22-acre parcel from the existing+�- <br /> 80.52-aere tract within 120 days of BOCC approval of the rezoning application. <br /> 11. Offsite easements for water,wastewaters utilitest and access shall be recorded within 120 days after <br /> approval of the rezon I ng a p pi icati o n. <br /> 12. Offsite landscape preservation easement shall be recorded within 120 days after approval of the <br /> rezoning application. <br /> 13. Impervious surface transfer shall be recorded within 120 days after approval of the rezoning <br /> application. <br /> 14. The project shall maintain the existi ng vegetati on on the north,south,and west sides of the site and <br /> incorporate an offsite easement area of approximately 1.28 acres along the northem,southern,and <br /> waste parcel IInes in Ileu of standards contained in Section 6.8,Landscaping,Buffers,and Tree <br /> Protection:Street Treas,Between Lot Plantings,Foundation Plantings,Landscaping of Ve h icu la r Areas, <br /> and Screening of the Unified Development Ordinance. <br /> ORANGE COUNTY <br /> NORI-H CAROLINA <br /> 2 <br /> 3 <br /> 4 Slide#14 <br /> Proposed Conditions (Attachment 9) <br /> Per Sectlon 2.9.1(F)(3)of the LID0,the folIowing conditions are being proposed: <br /> 15. The final landscape plan will be reviewed as part of tha Zoning Compliance Permit process.I existing <br /> vegetation contained on site or within the recorded landscape preservation easement area does not <br /> meet UDO standards,additional plantings shall be required.All required landscaping plantings shall be <br /> selected from the 0range County Preferred Plant List. <br /> 16. Al required landscaping for Phase 1 shall be installed prior to the issuance of a Certificate of <br /> Compliance for Phase 1 allowing forthe units to be rented/occupied.Required landscaping shall be <br /> Installed per phase. <br /> 17. The applicantshaII be required to maintain all required land use buffers,including those of preserved <br /> vegetation,in accordance with the requirements of the 0range County Unified D eve]opment 0rdinance <br /> Section 6.8,Landscaping,Buffers,and Tree Protection. <br /> 18. Proposed driveway con nectionswith NC-57 shall be paved with asphalt. <br /> 19. The parking and drive aisles shall be surfaced with Type 57 washed stone. <br /> 20. The Planning Director shall have the authority to review and approve minor changes to the approved <br /> plan,per Section 2.9.1(1),Alterations to an Approved Conditional District of the Orange County Unified <br /> Development Ordinance,specificto the location and arra ngem a nt of deve lop ment with I n the limits of <br /> disturbance and the proposed"activity area".The"activity area"shall be defined as the edge of gravel <br /> as shown on the provided conditional zoning plan set. <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br /> 5 <br /> 6 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.