Orange County NC Website
1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: June 27, 2002 <br /> Action Agenda <br /> Item No. . <br /> SUBJECT: Bid Award: Scheduled Roof Replacements <br /> DEPARTMENT: Purchasing and Central PUBLIC HEARING: (YIN) No <br /> Services & Public Works <br /> Department <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> Pam Jones (919) 245-2652 <br /> Engineer Letter of Certification Wilbert McAdoo (919) 245-2625 <br /> w/Bid Tabulation TELEPHONE NUMBERS: <br /> Hillsborough 732-8181 <br /> Chapel Hill 968.4501 <br /> Durham 688-7331 <br /> Mebane 336-227-2031 <br /> PURPOSE: To consider awarding a bid for roof replacement pursuant to the annual roof <br /> replacement schedule to Owens Roofing, Inc., of Raleigh, NC. <br /> BACKGROUND: Several years ago, Orange County contracted with CTL Engineering to <br /> evaluate the roofs on all County buildings. The results of the evaluation formed the basis of a <br /> schedule of roof replacements. The schedule considers, among other factors, the age and <br /> condition of the roof and its likelihood to fail within a given period of time. The schedule <br /> contemplates replacement prior to the estimated failure period, thereby eliminating the need to <br /> do remedial repairs because of water damage. The County solicits bids for work included under <br /> the roof replacement schedule annually. The 2001-2002 replacements include the following: <br /> • Animal Control building <br /> • Purchasing Building (old metal roof only) <br /> • 503 West Franklin Street—Sector 3 <br /> • Dickson House and outbuildings <br /> Bid Results <br /> The bids reflect a very positive change in the bidding climate as compared to our experience in <br /> the past several years. The low bid, including all roofs in the project, is $141,398 as submitted <br /> by Owens Roofing, Inc., of Raleigh, NC. The engineering estimate for this work was <br /> approximately $200,000. <br /> Schedule <br /> The work will begin upon execution of a contract and will be completed within 90 days. <br /> FINANCIAL IMPACT: Funds for this work are included in the 2001-2011 Capital Investment <br /> Plan. <br />