Browse
Search
2025-485-E-AMS-Decorative Concrete Coatings of N.C. Inc. dba Sundek of North Carolina-Continuation of Pool Deck Resurfacing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-485-E-AMS-Decorative Concrete Coatings of N.C. Inc. dba Sundek of North Carolina-Continuation of Pool Deck Resurfacing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 3:26:23 PM
Creation date
8/14/2025 3:26:11 PM
Metadata
Fields
Template:
Contract
Date
8/8/2025
Contract Starting Date
8/8/2025
Contract Ending Date
8/10/2025
Contract Document Type
Contract
Amount
$106,981.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Product/Service Description Qty.Unit Price Total <br />Preparation - Kid Pool 1. Drain the pool. <br />2. Power grind the entire pool with a walk behind <br />grinder and HEPA vacuum. <br />3. Make any necessary non-structural repairs and <br />power sand with fine-grit paper. Structural repairs <br />will require change order approval <br />4. Pressure & acid wash the entire pool. <br />5. Install thermal tape on edge of the tile or coping <br />for protection. <br />1 $700.00 $700.00 <br />EcoFinish_Aqua_Bright <br />Pool System - Kid Pool <br />1. Xylene & power blow pool. <br />2. Apply 3 coats of Epoxy to the entire pool. <br />3. Eco coat 1 - Prime at 1.5. Color: TBD <br />4. Eco coat 2 - Main at 1. <br />5. Remove any buildup or debris before the final <br />coat. <br />6. Eco Coat 3 - Finish at .5. <br />7. Apply stencil for design. <br />8. Apply Eco at .5. <br />9. Remove stencil and feather in stencil with <br />flame. <br />10. Re-install skimmer frame(s) & filter caps. <br />11. Start filling the pool (customer's responsibility <br />to complete). <br />1 $1,250.00 $1,250.00 <br />A deposit will be required for your project to be scheduled. <br />Projected start month: TBD 2025/2026 <br />25% deposit due on approval, 25% due at commencement and 50% due net 30 <br />days after completion. <br />TERMS AND CONDITIONS <br />IMPORTANT NOTICE: <br />The preceding description of work and related prices, which appear above, are <br />based on a limited visual inspection of the pool. Since the work to be performed by <br />Sundek of North Carolina involves the renovation or repair of an existing structure, <br />Sundek of North Carolian is unable to inform itself as to all potential existing <br />conditions and/or limitations that may be encountered on the jobsite. For this <br />reason, the price set forth above does not include all factors that may have <br />Total $106,981.00 <br />2 of 5 pages <br />Sundek of North Carolina <br />2717 Leighton Ridge Drive | Suite 101 | Wake Forest, NC 27587 <br />(919) 670-1550 | sales@sundeknc.com | https://sundeknc.com/ <br />Docusign Envelope ID: 83DA70D9-193E-414B-9C19-272291A5E9D6
The URL can be used to link to this page
Your browser does not support the video tag.