Browse
Search
OUTBoard Aug 18 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Aug 18 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:49:38 AM
Creation date
8/12/2025 11:47:18 AM
Metadata
Fields
Template:
BOCC
Date
8/18/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
95 <br /> 96 • Discussion includes adjustments or updates the Mebane Circulator <br /> 97 <br /> 98 Bus Stops <br /> 99 • Hillsborough stop updates discussed. <br /> 100 • GoTriangle service consolidation noted. <br /> 101 • 600 stops currently in Carrboro; short-range plan needed for service coverage. <br /> 102 <br /> 103 Service Expansion Considerations: <br /> 104 <br /> 105 • Possible midday, Chapel Hill Transit—IC connector, and weekday evening service enhancements. <br /> 106 <br /> 107 c. FY26 Annual Work Program <br /> 108 Nish presented slides 16through 19,providing an overview of the approved Fiscal Year2026AnnualWork <br /> 109 Program for the transit tax. He outlined the critical role of the Transit Plan as the guiding framework for <br /> 110 regional transit development and explained how its priorities are implemented through the Annual Work <br /> 111 Program. <br /> 112 In his presentation, Nish emphasized the importance of aligning projects with the plan's strategic goals <br /> 113 and detailed how the Work Program allocates transit tax revenues. He highlighted both operational and <br /> 114 capital expenditures, noting the contributions of each project sponsor and how their respective <br /> 115 initiatives are supported by the transit tax. <br /> 116 <br /> 117 d. MPO, RPO,and NCDOT <br /> 118 Nish informed members of all current infrastructure projects implemented in Orange County <br /> 119 <br /> 120 AGENDA ITEM 7:ADJOURNMENT <br /> 121 The OUTBoard meeting was adjourned at 8:37 pm.The next meeting is scheduled for July 16", 2025. <br />
The URL can be used to link to this page
Your browser does not support the video tag.