Orange County NC Website
61 <br /> Fire and Life Stephen Smith <br /> Safety Date: 08/06/25 Staff: stesmith(a_)orangecountync.gov <br /> 919-245-6151 <br /> No comments to add. <br /> David Genwright <br /> NCDOT Date: 8-5-2025 Staff: digenwrigh�ncdot.gov <br /> 336-570-6833 <br /> 1. This project appears to be proposed on the non NCDOT maintained portion of Eno <br /> Cemetery Rd. With no proposed roads, no proposed utilities in the right of way, low <br /> expected change in daily trips count, and low expected traffic impacts, no NCDOT <br /> action or approval is required as long as the county or other jurisdictions do not require <br /> an upgrade or change to the connection to the publicly maintained section of Eno <br /> Cemetery Road. <br /> Jack Moran <br /> Planning Date: 8-4-2025 Staff: 0omoran(a0rangecountync.gov <br /> 919-245-2571 <br /> 1. Staff has deemed the application complete. The variance request is currently scheduled <br /> for Board of Adjustment review at the August 13, 2025 meeting of the BOA. <br /> 2. In accordance with UDO Section 2.12.6, the property was posted and mailings were sent <br /> Wednesday, July 30, 2025, 14 days before the scheduled BOA evidentiary hearing. <br /> Matt Taylor <br /> Solid Waste Date: 8/6/25 Staff: mtaylor orangecountync.gov <br /> 919-918-4905 <br /> 1. No Comments <br /> Stormwater Christopher Sandt <br /> Management Date: 7/30/25 Staff: csandt(a-orangecountync.gov <br /> 919-245-2583 <br /> 1. The project is located in the Upper Eno Critical Watershed Overlay District. The <br /> submittal of a Stormwater Management Plan (SMP) is required for any proposed Land- <br /> Disturbing Activity exceeding 21,780 square feet. Land disturbance thresholds are <br /> cumulative to parent tract and will carry over to any/all subdivided lots. <br /> Transportation Darlene Weaver <br /> Services Date: Staff: dweaver(a_orangecountync.gov <br /> 919-245-2002 <br /> 1. None received. <br />