Browse
Search
2025-467-E-AMS-Harrod and Assoc Constructors-Replace Whitted Windows included in Alternates 1-11)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-467-E-AMS-Harrod and Assoc Constructors-Replace Whitted Windows included in Alternates 1-11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2025 1:14:55 PM
Creation date
8/6/2025 1:10:24 PM
Metadata
Fields
Template:
Contract
Date
7/31/2025
Contract Starting Date
7/31/2025
Contract Ending Date
8/1/2025
Contract Document Type
Contract
Amount
$910,147.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> P.O. BOX 90713 <br /> RALEIGH, NC 27675 <br />(919) 828-7782 off <br />(919) 828-8817 fax <br /> <br />HARROD AND ASSOC. CONSTRUCTORS, INC. • 6612 FLEETWOOD DRIVE • SUITE 100 • RALEIGH, NC 27612 <br />GC LICENSE #32791 <br /> <br /> <br /> <br />Smith Sinnette Architecture July 25, 2025 <br />Attn: Drew Wilgus <br />4600 Lake Boone Trail, Suite 205 <br />Raleigh, NC 27607 <br /> <br />Re: Orange County Architectural Renovation Project <br /> <br />Mr. Wilgus, <br /> <br />Please accept Harrod and Associates’ Change Proposal to incorporate into project scope bid-day Window <br />Alternates 01 through 11. We were able to secure original bid-day pricing with the manufacturer. Pricing, <br />however, is good only through August 01, 2025, at which time this is subject to increase per manufacturer. <br /> <br />This work will require a contract time extension, dependent upon when this work is released and shop <br />drawings and approvals. We anticipate the field installation work to take ten (10) weeks to complete. <br /> <br />We propose to complete work for the amount of ……………………………………………...... $910,147 <br /> <br />Please note that this proposal is good only through Friday, August 01, 2025, at which time this is subject to <br />increase per manufacturer. <br /> <br /> <br /> <br /> <br />Sincerely, <br />SRoller <br />Scott Roller <br />Docusign Envelope ID: CDA8BC13-5510-49F0-8DB8-09A7E9128D06
The URL can be used to link to this page
Your browser does not support the video tag.