Browse
Search
2025-467-E-AMS-Harrod and Assoc Constructors-Replace Whitted Windows included in Alternates 1-11)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-467-E-AMS-Harrod and Assoc Constructors-Replace Whitted Windows included in Alternates 1-11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2025 1:14:55 PM
Creation date
8/6/2025 1:10:24 PM
Metadata
Fields
Template:
Contract
Date
7/31/2025
Contract Starting Date
7/31/2025
Contract Ending Date
8/1/2025
Contract Document Type
Contract
Amount
$910,147.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br /> <br /> <br /> <br /> <br /> <br />ALLOWANCES 01 21 00 - 4 <br /> <br /> <br /> <br />Allowance No. Up/A-2; Flashing Repair/Repointing Above Cornice: <br /> Allow an amount per linear foot to repair flashing and or repoint brick above the metal cornice of the Whitted <br />Building. <br /> Quantity: 100 LF <br /> <br />Allowance No. Up/A-2A; Walls Terminating at Windows <br /> Allow an amount per linear foot (measured vertically) to repair wall terminations at windows as they are re- <br />placed. Whitted Building. <br /> Quantity: 100 LF <br /> <br />Allowance No. Up/A-2B; Ceilings Terminating at Windows <br /> Allow an amount per linear foot (measured horizontally) to repair suspended ceiling edge at windows as they <br />are replaced. Whitted Building. <br /> Quantity: 300 LF <br /> <br />Allowance No. A-3; General Contingency – Cedar Grove Community Center: <br /> Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of <br />subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be <br />provided within the contract price. If there is unused allowance at the conclusion of the project, the allowance <br />plus 15% will be deducted from the contract. <br /> Contingency: $25,000 Lump Sum <br /> <br />Allowance No. A-4; General Contingency – Whitted Building Window Replacement: <br /> Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of <br />subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be <br />provided within the contract price. If there is unused allowance at the conclusion of the project, the allowance <br />plus 15% will be deducted from the contract. <br /> Contingency: $60,000 Lump Sum <br /> <br />Allowance No. A-5; General Contingency – Gateway Center Elevator Modernization: <br /> Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of <br />subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be <br />provided within the contract price. If there is unused allowance at the conclusion of the project, the allowance <br />plus 15% will be deducted from the contract. <br /> Contingency: $25,000 Lump Sum <br /> <br />Allowance No. A-6; General Contingency – Orange County Courthouse Elevator Modernization: <br /> Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of <br />subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be <br />provided within the contract price. If there is unused allowance at the conclusion of the project, the allowance <br />plus 15% will be deducted from the contract. <br /> Contingency: $25,000 Lump Sum <br /> <br />Allowance No. A-7; General Contingency – Piedmont Food Processing Center: <br /> Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of <br />subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be <br />provided within the contract price. If there is unused allowance at the conclusion of the project, the allowance <br />plus 15% will be deducted from the contract. <br /> Contingency: $3,000 Lump Sum <br /> <br /> <br />Docusign Envelope ID: CDA8BC13-5510-49F0-8DB8-09A7E9128D06
The URL can be used to link to this page
Your browser does not support the video tag.