Orange County NC Website
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br />ALLOWANCES 01 21 00 - 3 <br />days of initial change order authorizing work to proceed on that allowance; otherwise, such claims will be rejected. <br />B. As a procedural restriction no mark-up (increase or decrease) shall be included in the change order amount for <br />Contractor’s increase or decrease in handling, labor, installation, overhead or profit unless purchase order amount <br />varies from allowance. <br />C. Change orders prepared to return unused allowance amounts to the Owner shall be subject to the same requirements <br />for the return of appropriate profit and overhead as other change orders in accordance with the Conditions of the <br />Contract. Where the Contractor has been directed not to include his related costs (profit and overhead) in the <br />Contract Sum for contingency allowances, the return of profit and overhead shall not be excepted. <br />1.8 UNUSED MATERIALS <br />A. Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, after <br />installation has been completed and accepted. <br />1. If requested by Architect, prepare unused material for storage by Owner when it is not economically practical <br />to return the material for credit. If directed by Architect, deliver unused material to Owner’s storage space. <br />Otherwise, disposal of unused material is Contractor’s responsibility. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or <br />defective products to manufacturer for replacement. <br />3.2 PREPARATION <br />A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that <br />each allowance item is completely integrated and interfaced with related work. <br />3.3 SCHEDULE OF ALLOWANCES <br />Allowance No. Up/A-1; Moisture Remediation Primer: <br />Allow an amount per square foot for addition moisture mitigation primer for flooring that is not otherwise specified to <br />receive such in the design documents. <br /> Quantity: 750 SF <br /> <br />Docusign Envelope ID: CDA8BC13-5510-49F0-8DB8-09A7E9128D06