Orange County NC Website
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br />SUMMARY 01 10 00 - 2 <br />6. Orange County Animal Services - Floor replacement, approximately 11,700sf <br />1.4 TYPE OF CONTRACT <br />A. Project will be constructed under a single prime contract. Bidders submitting single prime contract bids, <br />and subsequently successful single prime Contractors, shall be aware that all work of the project is <br />included in the Work of a single prime contractor, regardless of the divisions of work indicated on the <br />Drawings and in the Project Manual. All references and indications in the Drawings and the Project <br />Manual to separate Prime Contracts shall apply to the Single Prime Contract. Bid Alternates and Unit <br />Prices shall apply to the Single Prime Contract. Allowances shall be included in the Single Prime <br />Contract. <br />Elevator modernization work is intended to be delivered turnkey by approved elevator <br />manufacturer/installer under the supervision of the General Contractor and thus is included in the <br />contract. Refer to Division 14 for more information. <br />1.5 WORK UNDER OTHER CONTRACTS: <br />A. General: Cooperate fully with separate contractors so work on those contracts may be carried out <br />smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this <br />Contract with work performed under separate contracts. <br />1.6 USE OF PREMISES <br />A. General: Contractor shall have limited use of premises for construction operations as indicated on <br />Drawings by the Contract limits or otherwise approved by the Owner and Architect. <br />B. Use of Site: Limit use of premises to limits indicated. Do not disturb portions of Project site beyond <br />areas in which the Work is indicated. <br />1. Limits: Confine constructions operations to limits indicated on drawings. <br />2. Owner Occupancy: Each of the facilities will remain operational during construction activities . <br />3. Driveways, Sidewalks and Entrances: Keep driveways, sidewalks and entrances serving premises <br />clear and available to Owner, Owner’s employees, and emergency vehicles at all times. Do not <br />use these areas for parking or storage of materials. <br />a. Schedule deliveries to minimize use of driveways and entrances. <br />b. Schedule deliveries to minimize space and time requirements for storage of materials and <br />equipment on-site. <br />1.7 OWNER’S OCCUPANCY REQUIREMENTS <br />A. Full Owner Occupancy: The site and building will be fully occupied during the course of construction. <br />Strict limits on work shall be observed to assure complete safety of the staff occupying the building and <br />grounds at all times. <br />1.8 WORK RESTRICTIONS <br />A. On-Site Work Hours: Work shall be generally performed 7:00 am to 7:00 pm Monday through Friday, <br />except otherwise indicated. <br />1. Weekend Hours: Coordinate with Owner <br />2. Early Morning Hours: Coordinate with Owner <br />Docusign Envelope ID: CDA8BC13-5510-49F0-8DB8-09A7E9128D06