Browse
Search
2025-467-E-AMS-Harrod and Assoc Constructors-Replace Whitted Windows included in Alternates 1-11)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-467-E-AMS-Harrod and Assoc Constructors-Replace Whitted Windows included in Alternates 1-11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2025 1:14:55 PM
Creation date
8/6/2025 1:10:24 PM
Metadata
Fields
Template:
Contract
Date
7/31/2025
Contract Starting Date
7/31/2025
Contract Ending Date
8/1/2025
Contract Document Type
Contract
Amount
$910,147.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 01/24 1 <br />[Departmental Use Only] <br />TITLE TEMPLATE FOR REFERENCE <br />FY <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the <br />day of , 20 , by and between , (hereinafter called the “Contractor”), and Orange County, <br />a political subdivision of the State of North Carolina, (hereinafter called the “County,” “Orange County,” <br />or “Owner”). <br />W I T N E S S E T H: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br />a. This Agreement. <br />b. Designer Approved Bulletins and Field Orders. <br />c. Request for Proposals and addenda thereto. <br />d. Proposal. <br />2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />a. Construction Drawings prepared by (Sheet dated ) <br />b. Written specifications prepared by the project engineer. <br />c. proposal dated , 20 which fully describes the work to be performed. <br />Such work will hereafter be called the “Work”. <br />d. Related documents listed under Section 1 above. <br />3. TERM AND SCHEDULING <br />a. The Contractor agrees to commence work pursuant to the written Notice to Proceed. <br />b. The Contractor agrees to complete substantially all Work by , 20 . <br />Docusign Envelope ID: CDA8BC13-5510-49F0-8DB8-09A7E9128D06
The URL can be used to link to this page
Your browser does not support the video tag.