Orange County NC Website
Approved 9.4.24 <br />Patrick Mallett: Where do you stop? I mean, it would keep going and we need to have the process start 395 <br />with the property owner and a surveyor. You have to have a surveyed boundary and a 396 <br />surveyor attesting to the fact that that's the ridge line and it could keep going, we have 397 <br />some adjacent property owners and I think one of them is going to contemplate whether 398 <br />it's worth it for him to go through the same process. It's the property to the south of this 399 <br />one. 400 <br />Lamar Proctor: What's the practical result of moving it in terms of property use? 401 <br />Patrick Mallett: It's simple but nuanced. Simple question with a nuanced answer. I think for larger 402 <br />properties, not too much. In the second case you're going to see it had a direct impact on 403 <br />that property owner and what she wanted to do. In this case, I think it has more to do with 404 <br />the engineer pointing out if there's any development activity on this property or the smaller 405 <br />lot, Lot No. 2 on this survey, there are implications that would apply in terms of impervious 406 <br />to Lot No. 2. Ultimately the land disturbing activity on these properties would require a 407 <br />land disturbance permit, a storm water analysis and so it has more to do with, from the 408 <br />engineer's perspective, in that analysis I want to show pre and post-development, which 409 <br />way the water's breaking and do my analysis accordingly versus running that analysis on 410 <br />an arbitrary line that defies the laws of physics. 411 <br />Lamar Proctor: Got it, thank you. 412 <br />Patrick Mallett: Staff has determined the application is complete, staff reviewed the considerations of the 413 <br />request, and it adheres to the principles of the Orange County 2030 comprehensive plan. 414 <br />We went through the notifications like we would with other rezoning requests, signs, 415 <br />notices, and put it on our website. And this is where we are. We went through planning 416 <br />staff review, the DAC review, comments from other departments, and then this would get 417 <br />referred on like other zoning cases to the board of county commissioners. We 418 <br />recommend that you receive the rezoning application deliberate on the proposals desired, 419 <br />consider the planning director's recommendation and make a recommendation to the 420 <br />BOCC on either a statement of consistency or statement of inconsistency in the proposed 421 <br />attachments. Our hope is to get this before the BOCC in time for September the 5th. The 422 <br />next case, when I stop here you can ask questions about this case, then I can move on to 423 <br />the next one. 424 <br />Adam Beeman: We have two members of the public that want to speak on number 9. 425 <br />Lamar Proctor: Is that the next one? 426 <br />Adam Beeman: This one we're on right now. 427 <br />Jerry Blanchard: I’ll decline. All of my questions have already been answered. 428 <br />Adam Beeman: Are you Jerry? 429 <br />Jerry Blanchard: Yes sir. 430 <br />Adam Beeman: The only other member was Frank. 431 <br />Frank Cohen: I also yield my time, Patrick covered everything I had to say. 432 <br />Adam Beeman: All right, perfect. Go ahead Charity. 433