Browse
Search
PB Agenda Packet - Aug 6 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2025
>
PB Agenda Packet - Aug 6 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 1:02:09 PM
Creation date
8/4/2025 12:59:48 PM
Metadata
Fields
Template:
BOCC
Date
8/6/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
8-6-25 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 6th TWSC Build <br />1: NC 54 & Site Drive Timing Plan: AM Peak Hour <br />Rigsbee Subdivision - Orange County, NC Synchro 11 Report <br />Bolton & Menk Page 1 <br />Intersection <br />Int Delay, s/veh 0.6 <br />Movement EBL EBT WBT WBR SBL SBR <br />Lane Configurations <br />Traffic Vol, veh/h 4 1024 295 7 21 5 <br />Future Vol, veh/h 4 1024 295 7 21 5 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Free Free Free Free Stop Stop <br />RT Channelized - None - None - None <br />Storage Length - - - - 0 - <br />Veh in Median Storage, # - 0 0 - 0 - <br />Grade, % - 0 0 - 0 - <br />Peak Hour Factor 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 2 2 2 2 2 <br />Mvmt Flow 4 1138 328 8 23 6 <br /> <br />Major/Minor Major1 Major2 Minor2 <br />Conflicting Flow All 336 0 - 0 1478 332 <br /> Stage 1 - - - - 332 - <br /> Stage 2 - - - - 1146 - <br />Critical Hdwy 4.12 - - - 6.42 6.22 <br />Critical Hdwy Stg 1 - - - - 5.42 - <br />Critical Hdwy Stg 2 - - - - 5.42 - <br />Follow-up Hdwy 2.218 - - - 3.518 3.318 <br />Pot Cap-1 Maneuver 1223 - - - 139 710 <br /> Stage 1 - - - - 727 - <br /> Stage 2 - - - - 303 - <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 1223 - - - 138 710 <br />Mov Cap-2 Maneuver - - - - 138 - <br /> Stage 1 - - - - 720 - <br /> Stage 2 - - - - 303 - <br /> <br />Approach EB WB SB <br />HCM Control Delay, s 0 0 31.8 <br />HCM LOS D <br /> <br />Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 <br />Capacity (veh/h)1223 - - - 163 <br />HCM Lane V/C Ratio 0.004 - - - 0.177 <br />HCM Control Delay (s) 8 0 - - 31.8 <br />HCM Lane LOS A A - - D <br />HCM 95th %tile Q(veh) 0 - - - 0.6 <br />78
The URL can be used to link to this page
Your browser does not support the video tag.