Browse
Search
PB Agenda Packet - Aug 6 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2025
>
PB Agenda Packet - Aug 6 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 1:02:09 PM
Creation date
8/4/2025 12:59:48 PM
Metadata
Fields
Template:
BOCC
Date
8/6/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
8-6-25 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Conclusions: <br />As detailed above, the depth to water within the adjacent Rigsbee and Griffin Wells was continuously <br />monitored before, during and after drawdown of the Proposed Community Well. No water level <br />changes beyond the normal variations recorded in Rigsbee and the Griffin Wells occurred during <br />maximum drawdown, steady state withdrawal, or subsequent recovery of the Proposed Community <br />Well. As such, it is anticipated that the analytical modeling will further demonstrate that use of the <br />Proposed Community Well consistent with State regulations to serve the proposed Rigsbee Residential <br />Development will not negatively impact adjacent wells. <br /> <br />Should you have any questions, or require further clarification, please let me know. <br /> <br />Sincerely, <br />Spangler Environmental, LLC <br /> <br /> <br /> <br />Ward Marotti <br />Director: Natural Resources <br /> <br /> <br />59
The URL can be used to link to this page
Your browser does not support the video tag.