Orange County NC Website
Attachment C <br /> <br /> <br /> <br />Based on the Neighborhood Information Meeting feedback, the following changes were <br />addressed on the plans or in process of being conducted: <br /> <br /> <br />➢ We have engaged a hydrogeologist with Spangler Environmental to study further water <br />availability and existing and future demand in the area. <br />➢ Our traffic engineer, Josh Reinke, PE with Bolton & Menk, prepared a Trip Generation <br />letter. NCDOT will review the study and determine if any road improvements, such as <br />turn lanes, are necessary as we move forward to subdivision plat. It should be noted that <br />NCDOT has received the Trip Generation Letter and a copy has been provided to <br />Orange County Planning Department. <br />➢ Our team is deeply focused on delivering a community that blends well with the rural and <br />natural characteristics of the region. We prepared and shared illustrations and <br />schematics of the proposed community prepared by Rachel Cotter RLA, Nicole Steele <br />PLA, Allison Gramolini RLA, CPSI, with Weston & Sampson Design Studio to specifically <br />show our desire to maintain the historic, natural environment and the overall rural <br />characteristic of the area. <br />➢ Danielle Cabral, EI and Don Sever, PE with Bowman Engineering will continue to <br />develop a stormwater design in accordance with County and State regulations. <br />➢ Forestar is reaching out to neighbors individually to address unique concerns raised in <br />the meeting. <br />117