Orange County NC Website
<br />building code, and standard electrical practices. Requirements that are not codified as of <br />the date of this proposal are excluded from this quotation. <br />Warranty-Warranty of electrical material and equipment supplied by Electrical Contractor <br />shall be for a period of one year from the date of final invoice. No warranty will be <br />provided for material and equipment supplied by others, and no warranty shall be <br />performed while invoice(s), including change order(s) are past due. <br />Waste-EV Revolution will dispose of waste generated from construction. <br />Payout Phases <br /> Final Inspection Complete (per unit) (100%) $6,615.55 <br /> Terms: Net 30 <br /> <br />This proposal does not become legal and binding unless signed by both parties. <br /> <br />________________________________Title__________________________ Date______________ <br />Owner/Contractor <br /> <br />______________________________________________________________ Date_______________ <br />Joel Bulpitt, EV Revolution <br /> <br />Docusign Envelope ID: 03614427-515A-47C9-9F4E-C1916BDEA051 <br />7/23/2025 <br />7/25/2025County Manager