Browse
Search
2025-455-E-County Mgr-EV Revolution-EV Charger Installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-455-E-County Mgr-EV Revolution-EV Charger Installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 8:33:52 AM
Creation date
7/30/2025 8:33:49 AM
Metadata
Fields
Template:
Contract
Date
7/23/2025
Contract Starting Date
7/23/2025
Contract Ending Date
7/25/2025
Contract Document Type
Contract
Amount
$6,615.55
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />EV Charger Detail <br />DESCRIPTION QTY EACH AMOUNT <br />Fractal FR-48C J1772 Charger <br />-Up to 48 amp output <br />-Utility Grade Metering <br />-WiFi/4g/Mesh networking capable <br />-Flexible Power Management Options <br />-OCCP Compliant <br />-Network Agnostic <br />-3 year hardware warranty <br />2 1,200.00 2,400.00 <br /> <br />Dual port Pedestal with Cable Management <br />System <br />1 1,854.00 1,854.00 <br /> <br />Subtotal 4,254.00 <br />Shipping 1 300.00 300.00 <br /> <br />Total EVSE Price $4,554.00 <br /> <br /> <br />Terms and Conditions <br />Plans/Specifications-Electrical work requested by others not indicated on plans and/or <br />specifications shall not be part of this agreement <br />Underground Work-All trenching assumes reasonable digging conditions with no major <br />rock that would require extra equipment and material to excavate. In such cases, there <br />may be additional charges based on evaluation of the conditions. <br />Weather-Project schedule may be delayed due to weather. Contractor is not responsible <br />for delays in the schedule due to weather. <br />Change Orders-Deviation or alteration to the scope of this agreement, including plans or <br />specification, shall be executed on receipt of written orders <br />Code and Installation Practices-Material and equipment supplied by Electrical Contractor <br />shall be installed in accordance with the National Electrical Code and local electrical <br />Docusign Envelope ID: 03614427-515A-47C9-9F4E-C1916BDEA051
The URL can be used to link to this page
Your browser does not support the video tag.