Browse
Search
2025-454-E-AMS-Pisgah Energy-Orange County Solar Feasibility Study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-454-E-AMS-Pisgah Energy-Orange County Solar Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 8:33:21 AM
Creation date
7/30/2025 8:33:08 AM
Metadata
Fields
Template:
Contract
Date
7/24/2025
Contract Starting Date
7/24/2025
Contract Ending Date
7/25/2025
Contract Document Type
Contract
Amount
$88,460.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County – Solar Feasibility Study Submitted by Pisgah Energy <br />Solar Feasibility Study Proposal 3 | P a g e <br />overall layout and heights, as well as basic information about the solar PV system such as capacity and total <br />area of PV system, and the upward, downward, lateral reaction forces that the canopy will transfer to the <br />parking deck. NV5 will review these details and verify that that the garage can or cannot accommodate the <br />structural forces from the solar PV canopy. <br />•Recommendations and design for battery-based systems for critical back-up power and/or utility savings. <br />•Continued design-development, production of construction documents, and construction administration <br />services after feasibility. <br />•Design-Build Construction Services and Commissions Services. <br />•3-D Modeling. <br />•EV Charging station evaluation. <br />Current standard billing rates are as follows: <br />Pisgah Energy Position Title <br />Senior Project Manager……………………………………………………………………………………...................$196/hr. <br />Project Manager/ Designer……………………………………………………………………………………………...$176/hr. <br />Master Electrician………………………………………………………………………………………………………...$176/hr. <br />Energy Usage Analyst/ Utility Interconnection Specialist………………………………………………………....$176/hr. <br />Construction Manager…………………………………………………………………………………………………...$156/hr. <br />NV5 Position Title <br />Vice President……………………………………………………………………………………..................................$295/hr. <br />Group Leader……………………………………………………………………………………………........................$200/hr. <br />Project Manager………………………………………………………………………………………………………......$150/hr. <br />Project Engineer………………………………………………………......................................................................$140/hr. <br />Reimbursable Expenses - Reimbursable expenses shall be in addition to the compensation for basic and <br />additional services and will be invoiced according to the line items below and will not exceed these values. <br />These services include actual expenditures incurred by Pisgah Energy and NV5. Reimbursable expenses <br />include: <br />Orange County Reimbursable Expenses: <br />•Lodging expenses – Not to Exceed - $1,080 <br />•Meal expenses – Not to Exceed - $650 <br />•Travel expenses (Mileage rates per current NCDOR) – Not to Exceed - $1,700 <br />Town of Hillsborough Reimbursable Expenses: <br />•Lodging expenses – Not to Exceed - $540 <br />•Meal expenses – Not to Exceed - $250 <br />•Travel expenses (Mileage rates per current NCDOR) – Not to Exceed - $500 <br />Docusign Envelope ID: 2AE091DA-4ECA-480A-9788-25C1D93FC986
The URL can be used to link to this page
Your browser does not support the video tag.