Orange County – Solar Feasibility Study Submitted by Pisgah Energy <br />Solar Feasibility Study Proposal 2| P a g e <br />investigation will require support from County and Town staff members to access the facilities. Access to the rooftops, <br />electrical rooms and IT rooms must be provided. Site visit reports submitted to County and Town staff. <br />5)Preliminary Solar Design and Helioscope Production Reports – Helioscope is the solar design and production <br />modeling software that will be used for the preliminary designs. The Helioscope report defines the DC/ AC capacity of <br />the solar project, lists all model numbers/ quantities for the equipment used in the preliminary designs, and displays <br />the estimated annual / monthly energy generation in kilowatt-hours (kWh). A comparison of electricity consumption at <br />the site to the solar PV system output will be provided. The location and layout of the solar project, as well as the <br />shading analysis is shown in the report. The CO2 offset from the solar PV system will be provided. <br />6)Structural Analysis of Proposed PV Systems – Solar layouts will be provided to NV5 along with the dead-load weight <br />of the solar PV system, as well as any existing structural drawings that are available. NV5 will conduct a site visit to <br />evaluate the roof framing structure to determine whether the roof has the structural capacity to safely support the <br />proposed solar system. If the assumed system increases the force in the structural supporting elements by more than <br />ten (10) percent, NV5 will provide general strengthening recommendations. Following the visit, NV5 will provide a <br />certified report summarizing the findings, assessing the conditions of the roof structure, and making recommendations <br />for each building. <br />7)Project Budgeting - Each project will be estimated via line-item estimate. The budgets will include the estimated costs <br />for continued design-development, interconnection with utility, construction, and construction administration. <br />8)Financial Analysis – After completing project estimating and system design details (including annual production and <br />the applicable utility rate schedule), we will complete a financial analysis that includes the applicable incentives for <br />each project and aggregated portfolio. The metrics for financial analysis include Net Present Value (NPV), Internal <br />Rate of Return (IRR) and Levelized Cost of Energy (LCOE). Operation and Maintenance costs, facilities service <br />upgrades (where applicable) and interconnection costs will also be included in the financial analysis. We will work with <br />County and Town staff to prioritize which projects are most beneficial and likely to have the best return on investment. <br />9)Compiled Feasibility Report – Once the feasibility studies are complete, we will compile our findings into a <br />comprehensive report and present it to County and Town Staff. <br />10)Meetings – Meeting with owner as required at key milestones to present findings. Progress report emails will be sent <br />to staff members every two weeks. <br />11)Pricing - Valid for 30 days. <br />12)Any changes in scope are excluded from Basic Services. <br />Orange County Fees - The lump sum fee for the basic services above, excluding reimbursables expenses is: <br />Eighty-Eight Thousand Four Hundred Sixty Dollars………………………………………….…………………..$88,460 <br />Town of Hillsborough Fees - The lump sum fee for the basic services above, excluding reimbursables expenses is: <br />Twenty-Three Thousand Two Hundred Sixty Dollars…………………………………….……………..………...$23,460 <br />Payment Terms – Project will be invoiced monthly for the project’s work in progress. Payment is due Net 30 from date <br />of the invoice. Should the project be postponed, put on hold, canceled, or delayed, payment for any services provided <br />will be due. Please be advised that a fee may be incurred if the project is put on hold or reactivated later. <br />Additional Services – Upon mutual agreement, we may provide services not listed in this proposal or items excluded <br />per the hourly rate schedule provided below, unless a specific fee is proposed and agreed upon before work on the <br />additional service begins. Additional services include, but are not limited to, the following: <br />•Changes in scope during the feasibility study. <br />•Revisions, alternates, or changes to the preliminary solar PV system designs. <br />•Detailed design of any reinforcement to existing structures. <br />•Eno River Parking Deck – Following completion of the feasibility study, additional design services are available <br />to develop the solar canopy structural design. The structural drawings will contain plan views, elevations with <br />Docusign Envelope ID: 2AE091DA-4ECA-480A-9788-25C1D93FC986