Browse
Search
2025-454-E-AMS-Pisgah Energy-Orange County Solar Feasibility Study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-454-E-AMS-Pisgah Energy-Orange County Solar Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 8:33:21 AM
Creation date
7/30/2025 8:33:08 AM
Metadata
Fields
Template:
Contract
Date
7/24/2025
Contract Starting Date
7/24/2025
Contract Ending Date
7/25/2025
Contract Document Type
Contract
Amount
$88,460.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shortlist. The short-listed firms may be invited to an interview with the County during the <br />second week of April 2025. A final selection will be made the last week of April 2025. <br /> <br />VI. Selection Criteria: <br /> <br />All submittals will be ranked based on qualifications. Orange County will establish a <br />short list of candidates and schedule interviews accordingly. The following criteria will <br />be the basis on which consultants will be evaluated (in no particular order): <br /> <br />• Clarity and comprehension of the firm’s project approach presentation indicating <br />a thorough understanding of the challenges typical of the project type and <br />capacity to deliver the project successfully (20 Points) <br />• Firm’s experience providing similar feasibility studies for projects of very similar <br />size and type structure within the past five (5) years, project team performance, <br />and reference letters (20 Points) <br />• Qualifications of principal(s) and actual staff to be assigned to perform desired <br />work, the level of involvement in the project for each person, and a listing of <br />similar projects completed by each employee within the past five (5) years, (20 <br />Points) <br />• Firm’s responsiveness and ability to provide desired services within the proposed <br />timeline (20 Points) and <br />• Firm’s experience with local regulations and incentives. (10 Points) <br />• Other factors that may be relevant to the project. (10 Points) <br />Docusign Envelope ID: 2AE091DA-4ECA-480A-9788-25C1D93FC986
The URL can be used to link to this page
Your browser does not support the video tag.