Browse
Search
2025-454-E-AMS-Pisgah Energy-Orange County Solar Feasibility Study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-454-E-AMS-Pisgah Energy-Orange County Solar Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 8:33:21 AM
Creation date
7/30/2025 8:33:08 AM
Metadata
Fields
Template:
Contract
Date
7/24/2025
Contract Starting Date
7/24/2025
Contract Ending Date
7/25/2025
Contract Document Type
Contract
Amount
$88,460.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Team organization including an identification of the lead consultant and <br />project manager, key personnel that will be working on the project, the role <br />of any proposed consultants, etc., <br />b. A statement of qualifications for all team members including resumes and <br />educational background. One-page resumes of all key personnel should <br />be provided (one page per person). The office locations of each team <br />member should be specified on the résumés. The submittal should, as a <br />part of the information provided for subcontractors, include the names, <br />locations, and general roles of the project team members. <br />c. A description of the current workload for identified individuals. <br />d. Firm’s experience with local regulations and incentives <br />5. A minimum of three references for similar projects (Maximum of 5 pages total) <br />including: <br />a. The name and date of the project, <br />b. The location of the client, and <br />c. A contact name including relevant contact information. <br />d. At least one of these references should be able to describe the proposed <br />project manager’s experience and qualifications. <br />6. Acknowledgement of receipt of any addenda. <br />8.Complete and notarize the E-Verify Affidavit form and include it with your submittal <br />9. Orange County Non-Discrimination Certification form. Complete the attached form <br />and include it with your submittal. <br />10. Supplemental Vendor Information: Historically Underutilized Businesses form. <br />Complete the form and include it with your submittal. <br /> <br />The page limits only apply to the specific sections. There is not an overall page limit for <br />your submittal. <br />All submittals, exhibits, responses, attachments, reports, charts, schedules, maps, and <br />illustrations shall become the property of Orange County upon receipt. PDF files should <br />include bookmarks that link to sections to allow easy document navigation. Proposals <br />may not use less than 12-point Times New Roman font. (Other fonts are acceptable but <br />the size should be no smaller than 12 points. Since qualification packages can be <br />submitted electronically, page limitations in this RFQ refer to pages of content. The <br />page limitations do not include front cover, back cover, section dividers, or table of <br />contents if included. Offerors shall provide all submittal components in one Portable <br />Document Format (PDF). <br /> <br />A selection committee composed of county staff will review all submittals received <br />against the selection criteria set forth in this RFQ. The committee will develop a <br />Docusign Envelope ID: 2AE091DA-4ECA-480A-9788-25C1D93FC986
The URL can be used to link to this page
Your browser does not support the video tag.