Browse
Search
2025-430-E-AMS-Brady Trane Service-DA's Office_Replace HVAC Unit due to the Tropical Storm
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-430-E-AMS-Brady Trane Service-DA's Office_Replace HVAC Unit due to the Tropical Storm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2025 9:33:32 AM
Creation date
7/17/2025 9:33:24 AM
Metadata
Fields
Template:
Contract
Date
7/15/2025
Contract Starting Date
7/15/2025
Contract Ending Date
7/16/2025
Contract Document Type
Contract
Amount
$65,747.55
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 5 of 11 <br /> <br /> <br />Air Balance <br />Brady excludes system air balancing for this project. The AHU air flow rate will be set per <br />the manufacturer’s specifications at the discharge of the AHU. <br /> <br />Start-Up <br />A Brady factory-authorized technician will perform start-up and inspection of the new split <br />system according to the manufacturers written instructions. <br /> <br />Clarifications <br />All work is based on straight time hours: Monday through Thursday from 7:00 am to 5:30 <br />pm. <br /> <br />Brady requires that the equipment for this project go through a submittal and review process <br />to verify equipment design and performance before the final order of equipment will be <br />released. This is completed to ensure that the end result meets the owner’s expectations. <br />Brady will request that you assign a company representative to review and sign off on the <br />equipment prior to order placement. <br /> <br />The AHU selected and quoted for this proposal is based on like for like change out <br />and does not reflect a change in capacity or load calculation for the area this unit serves. <br /> <br /> <br />Any code deficiencies related to the existing conditions not specifically identified in our <br />proposal is not included in our scope of work. <br /> <br />Unforeseen conditions related to the owners equipment or building that adversely impact <br />the cost of the project may result in additional changes. <br /> <br />When changing AHU out with like size AHU, it is assumed that the chilled water supply and <br />return piping, conduit, <br />wire, disconnects, breakers, electrical panel and duct work are adequately sized to serve <br />the proposed AHU and condensing unit, and that they are functional and installed per code. <br /> <br />The building heating and cooling load calculations are based on information provided by the <br />owner. Discrepancies of information provided and actual conditions could result in equipment <br />being sized incorrectly. Brady is not responsible for problems resulting from incorrect <br />information provided by the owner. <br /> <br />This proposal is subject to cancellation by Brady in the event any contract or purchase order <br />related to this proposal contains a provision that requires Brady to comply with any guidance <br />for contractor or subcontractor workplace locations published by the Safer Federal Workplace <br />Task Force. <br /> <br />This proposal is subject to cancellation by Brady in the event Brady is unable to perform due <br />to inability to secure qualified subcontractors willing to comply with any guidance for <br />contractor or subcontractor workplace locations published by the Safer Federal Workplace <br />Task Force, or Brady’s inability to comply with such guidance. <br /> <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 536C38FD-8251-462A-B864-9C7BF139043D
The URL can be used to link to this page
Your browser does not support the video tag.