Browse
Search
2025-430-E-AMS-Brady Trane Service-DA's Office_Replace HVAC Unit due to the Tropical Storm
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-430-E-AMS-Brady Trane Service-DA's Office_Replace HVAC Unit due to the Tropical Storm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2025 9:33:32 AM
Creation date
7/17/2025 9:33:24 AM
Metadata
Fields
Template:
Contract
Date
7/15/2025
Contract Starting Date
7/15/2025
Contract Ending Date
7/16/2025
Contract Document Type
Contract
Amount
$65,747.55
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 4 of 11 <br /> <br />Brady will replace all necessary Duct work and include transition duct work from the <br />existing to the new Equipment <br /> <br />Brady will supply a new Angle Frame for the new Equipment to set on in place of the <br />existing concrete blocks. <br /> <br />Electrical <br />Brady will replace existing disconnect, conduit and conductors required for load side electrical <br />service from point of existing disconnect to the new AHU. Disconnect, conduit and conductors <br />will be sized per the NEC and based on the AHU MOP and MCA provided to Brady by the <br />equipment manufacturer. <br /> <br />Brady will reuse existing breaker, conduit and conductors on line side. <br /> <br />Electrical connection to equipment will be made with short lengths of flexible "Liquid - Tite" <br />conduit. <br /> <br />All equipment has been selected for 208 volts, 60 hertz, and 3 phase electrical service. <br /> <br />Brady will provide nameplates for identification of all equipment, motor starters and disconnect <br />switches. <br /> <br />Ductwork <br />Brady will furnish and install all supply ductwork and transitions needed to connect the new <br />AHU to the existing air distribution system. <br /> <br />Brady will furnish and install all return ductwork and transition as needed to connect the new <br />AHU to the existing ducted air return system. <br /> <br />Brady will furnish and install all outside air ductwork and transition as needed to connect the <br />new AHU to the existing outside air duct system. <br /> <br />Rectangular supply, return, and outside air ductwork will meet the gauges and construction <br />methods indicated in the current ASHRAE guide and by SMACNA standards for the <br />indicated pressure classification. <br /> <br />Hanger and supports for all ductwork will be metal bands, angles and / or rods per ASHRAE <br />and SMACNA standards. <br /> <br />Insulation <br />All interior duct work shall be lined with 1" thick, 3 LB density duct liner. <br /> <br />Crane and Rigging <br />Brady will furnish all crane, rigging, and trucking as needed for this project. <br /> <br />Upon receipt of equipment on the job site, Brady will inspect the unit for possible damage <br />during transit. This will include an inspection of unit exterior, all doors, access panels and <br />openings. If damage has occurred it will be immediately reported to the delivering carrier <br />and the damage noted on the receiving copy of the bill of lading. <br /> <br />Controls <br />Brady will furnish and install smoke detector(s), conduit and wiring between the smoke <br />detector(s) and the AHU motor control circuit to interrupt operation upon sensing an alarm <br />condition per code. <br /> <br />Siemens to integrate new WSHP controller into existing Building Automation System. <br />Docusign Envelope ID: 536C38FD-8251-462A-B864-9C7BF139043D
The URL can be used to link to this page
Your browser does not support the video tag.