Browse
Search
ORC Agenda Packet - July 9 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2025
>
ORC Agenda Packet - July 9 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 4:33:32 PM
Creation date
7/14/2025 4:31:44 PM
Metadata
Fields
Template:
BOCC
Date
7/9/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 7: Subdivisions 59 <br /> Section 7.3: Phasing of Subdivisions <br /> excluding other than,.,ir+the widening of an existing public street; <br /> (3) Extends public water and/or sanitary sewage systems ether than sen,ir.e +n <br /> dal lefsto multiple lots represented on a plat; and/or <br /> (4) Necessitates the installation of drainage improvements which would require <br /> easements through one or more lots to serve other lots. <br /> (A) <br /> All c hrlivicinnc not nlaocified as an Exempt S bdn *600R; Miner Subdivision; oMajor Subdivision, Conditional DiStriGt(R-C—D -or NIR- <br /> (2) Maier Subdivision, Conditional Distrin4 (R_CD or NR_CD) <br /> T� <br /> A +rar-+of land that is ed fora subdivision into 21 n e Into <br /> Maier S-ladi..isiens are furt-hpr as fn.11 mys- <br /> Standard Maier Subdivision <br /> Manor Subdi..isien Gondi+ienal DmstroGt(R_CD er AIR_!`Il\ <br /> Maier Subdivision Gonditienal Distrin4(R_CD er AID_rll\ <br /> A tract of land that is proposed for a subdivision into 21 or more lots.. Thi of <br /> h ;ee shall follow the Zoning Atlas Amendment-Conditional District process <br /> eut4p,-ddetailed in Section 2.8 <br /> (B) <br /> /Q\ Cnr the purpose of determining whether a u bdiyisinn is a Standard Maier <br /> Land Records of Orange County as of November F 2003 <br /> SUBDIVISIONSSECTION 7.3: PHASING OF <br /> 7.3.1 Phasing of Maisr-Subdivisions" <br /> A major subdivision may be developed in phases, provided that: <br /> (A) Each phase r.nn+ains at least five into 6 1nieoois depicted on a phasing plan approved by <br /> the Board of County Commissioners as part of the-a prelim,c,.,,-,inaryPreIiminary subdivisien <br /> plat-Platwith the express determination that the pFoposed phasing makes at unlikely that a <br /> subdivider would willingly abandon a final phase that contains a required extension of a <br /> road or other infrastru c re• <br /> (B) The degree and extent of road, water supply, sewage disposal, stormwater management, <br /> erosion and sedimentation control, and other required improvements in the phase and <br /> previously approved phases ar6s sufficient to serve o,-handle all development within the <br /> phase; <br /> (C) The number of lots and amount of required open space or amenities in the phase and <br /> any previously approved phases is proportional; and <br /> {C)(D) Any improvements correlated with the phase are either realized prior to approval or the <br /> Final Plat or ensured with a Performance Guarantee, as allowed by Sections 2.27 and <br /> 7.4. <br /> 41 Provide for clarity and direct language. <br /> Orange County, North Carolina—Unified Development Ordinance Page 7-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.