Browse
Search
ORC Agenda Packet - July 9 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2025
>
ORC Agenda Packet - July 9 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 4:33:32 PM
Creation date
7/14/2025 4:31:44 PM
Metadata
Fields
Template:
BOCC
Date
7/9/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 4: Overlay Zoning Districts 16 <br /> Section 4.2:Watershed Protection Overlay Districts2F <br /> IMPERVIOUSTABLE 4.2.6: <br /> • <br /> DISTRICT <br /> 5 A-A-Fe rA0AM-M.,-,.rA 'At size wo h petential of up te five !E&a6 6R;.-.- 'At'-;ef FeQ-G-GFd Sept6mbeF4, <br /> 50% impervious surface limitl&R for all fire stations and solid waste collection centers_. Stormwater Control <br /> Measures(SCMs)are required if impervious surface exceeds 12%. f11, f21;A <br /> 12% impervious surface limitlSR for all other non-residential uses. f11, fQ1= <br /> UNIV-PW Oon-site infiltration of the first inch of stormwater runoff is required for all non-residential uses.; n� <br /> CANE-PW <br /> For CANE-PW,the total impervious surface limit(total Built Upon Area)for non-residential uses is limited to a <br /> I+anit ef1�%of the total watershed area (i.e.,a total of 139 acres of impervious surface within CANE-PW). r31 <br /> 5fnr nnn_rooider.+ia1 use 039 aGreS in ronIF=-P nn-acre minimum lot size with potential of up to five lots as <br /> small as two acres per lot for lots which existing prior to September 1, 2015(for UNIV-PW)or October 19, 1999 <br /> for CANE-PW . 67 <br /> 2 aGFe Fninknum lets e AND <br /> 50% impervious surface limi4&R for all fire stations and solid waste collection centers. Stormwater Control <br /> Measures(SCMs)are required if impervious surface exceeds 12%. r11, r21 A <br /> 12% impervious surface limitl&R for all other non-residential uses. r11, Q21 <br /> LITTLE-PW Oon-site infiltration of the first inch of stormwater runoff is required for all non-residential uses., n� <br /> For LITTLE-PW,the total impervious surface limit(total Built Upon Area)for non-residential uses is limited to a <br /> lianit ef1�%-of the total watershed area (i.e., a total of 406 acres of impervious surface within LITTLE-PW). r31 <br /> fnr n oirlon+iol use /AlIR o n l ITTI C_D\A/1 <br /> 2-acre minimum lot size. r�'j,-[246$ <br /> 70% impervious surface limit4R in Economic Development, Commercial and/or Commercial--Industrial Nodes <br /> as designated in the Land Use Element of the Comprehensive Plan (high-density option)_with Stormwater <br /> Control Measures (SCMs)are required if-if impervious surface IUD exceeds=12%. r11, r21;AXD <br /> 50% impervious surface limi4&R for all fire stations and solid waste collection centers outside of Commercial <br /> and/or Commercial-Industrial Nodes as designated in the Land Use Element of the Comprehensive Plan. with <br /> Stormwater Control Measures(SCMs)are required if impervious surface if ISR exceeds_12%. ,r21-- A1•D <br /> 12% impervious surface limitlSR for all other non-residential uses outside of Commercial and/or Commercial- <br /> U-ENO-PW Industrial Nodes as designated in the Land Use Element of the Comprehensive Plan. r11, r21 <br /> BACK-PW SAPID <br /> Oen-site infiltration of the first inch of stormwater runoff is required for all non-residential uses.; n� <br /> For U-ENO-PW, the total impervious surface limit(total Built Upon Area)for non-residential uses is limited to 5% <br /> of the total watershed area (i.e., a total of 4 limit+of 1,151 acres of impervious surface within U-ENO-PW)f e_ <br /> l31 <br /> For BACK-PW,the total impervious surface limit(total Built Upon Area)for non-residential uses is limited to 1% <br /> of the total watershed area (i.e., a total of 163 acres of impervious surface within BACK-PW). r31&",o^+a' <br /> +hro ghe t I LEAN D\A/(5 0%)and 163 onroo <br /> 0 69 <br /> 67 Staff recommendations to improve reading clarity. <br /> 68 Staff recommendations to improve reading clarity. <br /> 69 Staff recommendations to improve reading clarity. <br /> Orange County, North Carolina—Unified Development Ordinance Page 4-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.