Preliminary cost estimates for Phase II of the park (playground, picnic shelter, lighting) are <br />projected to range from $231,000 - $297,000 (actual costs may vary as construction bids are <br />received). Trail construction is expected to be done by volunteers or in house. A total of <br />$250,000 is available for Phase II of the park from the 2001 bond, <br />RECOMMENDATION(S): The Manager recommends that the Board authorize staff to have <br />a lighting plan for the playing field and walking track developed over the summer. <br />