Browse
Search
Agenda - 06-08-2004-5v
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 06-08-2004
>
Agenda - 06-08-2004-5v
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 4:10:52 PM
Creation date
8/29/2008 10:43:16 AM
Metadata
Fields
Template:
BOCC
Date
6/8/2004
Document Type
Agenda
Agenda Item
5v
Document Relationships
Minutes - 20040608
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: June 8, 2004 <br />SUBJECT: Efland Cheeks Park (Phase II) Lighting Plan <br />DEPARTMENT: Purchasing, ERCD, R &P <br />ATTACHMENT(S): <br />1) Projected Timetable of Activities <br />2) Site Plan <br />Action Agenda <br />Item No. 5-y <br />PUBLIC HEARING: (Y /N) No <br />INFORMATION CONTACT: <br />David Stancil, 245 -2590 <br />Lori Taft, 245 -2660 <br />Pam Jones, 245 -2650 <br />TELEPHONE NUMBERS: <br />Hillsborough <br />732 -8181 <br />Chapel Hilt <br />968 -4501 <br />Durham <br />688 -7331 <br />Mebane <br />336 - 227 -2031 <br />PURPOSE: To authorize staff to contract for a lighting plan for the field and walking track <br />lighting as the initial part of construction of Phase II of Efland- Cheeks Park. <br />BACKGROUND: In March 2004, the Board authorized the submittal of a site plan for Phase <br />II of Efland Cheeks Park. Prior to this action, the Board received the report of the Efland <br />Cheeks Park Concept Plan Review Committee in December 2003. Efland Cheeks Park is <br />co- located with Efland- Cheeks Elementary School in western Orange County. Funding for <br />Phase II of the park was included in voter- approved the 2001 Parks and Open Space Bond. <br />With the site plan for Phase II of the park approved in March, the pre - construction process <br />may now begin. Because of the small scope of this project, staff has prepared a timetable of <br />activities that lay out the activities needed to construct the pieces of Phase Il. The timetable <br />is shown as Attachment 1. <br />As the first step in the construction process, staff would like to have a lighting plan developed <br />over the summer. This would feature a lighting plan specific to the site, complete with <br />construction documents suitable for bidding the project. <br />Construction schedules for the other two pieces of contracted work, the playground and <br />picnic shelter, would be pursued later in 2004 as lighting installation is concluded. <br />FINANCIAL IMPACT: Cost of preparing a lighting plan are expected to be less than $5,000. <br />The attached timetable would call for a bid award for installation of field /walking track lighting <br />in September. <br />
The URL can be used to link to this page
Your browser does not support the video tag.