Browse
Search
2025-344-E-Solid Waste-M Recycle America LLC-Recycling and MSW Processing & Disposal
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-344-E-Solid Waste-M Recycle America LLC-Recycling and MSW Processing & Disposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 8:08:02 AM
Creation date
6/26/2025 8:06:57 AM
Metadata
Fields
Template:
Contract
Date
6/10/2025
Contract Starting Date
6/10/2025
Contract Ending Date
6/21/2025
Contract Document Type
Contract
Amount
$6,702,534.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> <br />Contractors are required to accept MSW materials at an agreed upon facility. Contractor must <br />furnish sufficient facilities, equipment, labor, financial capability, and experience to begin <br />accepting materials from OCSW within 30 days of contract execution but no later than July 1, 2025. <br />Contractor facilities shall maintain safe and efficient procedures for queuing, weighing, unloading, <br />screening, and vehicle departure to assure efficient use of the facility by OCSW. The Contractor <br />shall accept all MSW materials delivered to the agreed upon facility. The agreed upon facility shall <br />have sufficient capacity and availability for unloading, storage, transfer, or other disposal of <br />materials so as not to impair delivery of materials from OCSW. <br />The Contractor shall: <br />a. have a minimum of 5 years of experience disposal of MSW material, <br />b. have a minimum of 5 years of technical experience in the disposal of MSW material, <br />c. provide sufficient financial information to describe the financial condition and strength of the <br />company, <br />d. provide qualified staff to handle the day-to-day operations of receiving and disposal of material, <br />and <br />e. have the necessary facilities, equipment, and employees to operate a Transfer Station or other <br />facility to accept MSW material from OCSWM facilities. <br />4.2 MSW DISPOSAL <br />Orange County Solid Waste shall have priority consideration in weighing and off-loading materials. <br />The maximum total waiting/tipping time from arrival at the Vendors facility, to departure from the <br />facility, shall not exceed one-half hour per truck. It is the intent of OCSW to deliver MSW on the <br />same day on which they are collected from all locations mentioned in the list of all materials <br />accepted under 4.1. At a minimum, the Contractor must be available to receive materials Monday <br />through Saturday from 7:00 am until 4:00 pm, with holiday observances for New Year’s Day, Martin <br />Luther King Jr. Day, Good Friday, Memorial Day, Juneteenth, Independence Day, Labor Day, <br />Thanksgiving Day, and Christmas Day. <br />Orange County Solid Waste shall generally deliver the MSW to the vendor facility. <br />The Contractor shall provide or act as MSW disposal facility for the materials during the term of <br />the Contract. The Contractor shall not store or warehouse materials in violation of health and safety <br />standards and shall conform to all requirements provided for by the state and federal agencies. <br /> <br />4.3 PROCESSING, TRANSPORTING AND MARKETING <br />The Contractor shall bear all costs associated with disposal when materials are delivered to the <br />vendor facility. <br />Docusign Envelope ID: 3C46D4D9-4262-4835-B314-9FEB472CCC00
The URL can be used to link to this page
Your browser does not support the video tag.