Orange County NC Website
13 <br /> <br />Commodity Price Chart <br />Material Type Allocation Percent Price per ton AMV per ton <br />Glass 9.99% ($28.97) ($2.89) <br />UBC 1.20% $1,289.12 $16.78 <br />Steel 1.09% $160.83 $1.76 <br />HDPE Pigment 1.18% $158.08 $1.86 <br />HDPE Natural .81% $1,323.01 $10.73 <br />PET 3.16% $386.16 $12.20 <br />Mixed Paper 43.36% $57.20 $23.37 <br />Mixed Plastics #3-7 85% ($57.43) ($0.49) <br />#11 OCC 28.86% $102.60 $29.60 <br />Residual 9.51% ($57.43) ($5.46) <br /> 100% $87.46 <br /> 2.10 Considerations for the Future <br />The decision to make any of the proposed changes to County’s recycling program is per the <br />County’s discretion, and is dependent upon approval of budgetary increase. <br />3. PROPOSAL REQUIREMENTS FOR RECYCLING PROCESSOR <br />Submitted proposal must follow the following order and format: <br />3.1 PROPOSAL SUBMITTAL <br />Vendors shall populate all attachments of this RFP that require the Vendor to provide information <br />and include an authorized signature where requested. Vendor RFP responses shall include the <br />following items and those attachments should be arranged in the following order: <br /> <br />3.1.1 Introduction <br />• This section must include a brief statement of Proposer’s Company Background, Contact <br />Information, Federal ID number, and must include the signature of an individual who is <br />authorized to bind the Proposer contractually (Services Agreement RFP/RFQ). <br /> <br />3.1.2 Statement of Understanding of Services Sought by County – <br />This section must include a statement of Proposer’s understanding of the services being <br />sought by the County, and include a description of Scope of Work for accepting and <br />processing recyclables. <br /> <br />3.1.3 Materials Accepted for Recycling <br />Provide a detailed list, with pictures, of items accepted and not accepted as part of the <br />collection program. ONLY materials that the processor can and will recycle should be <br />included on the list. For example, if there is not a known available market for clamshells, <br />they should not be included in the acceptable list. <br /> <br />3.1.4 Subcontractors <br />This section must include a description of the proposed involvement of subcontractors, <br />including potential uses and responsibilities. <br /> <br /> <br />Docusign Envelope ID: 3C46D4D9-4262-4835-B314-9FEB472CCC00