Browse
Search
2025-337-E-AMS-Brady Services-TAB for RTU 2 & 3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-337-E-AMS-Brady Services-TAB for RTU 2 & 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 7:58:51 AM
Creation date
6/26/2025 7:58:47 AM
Metadata
Fields
Template:
Contract
Date
6/11/2025
Contract Starting Date
6/11/2025
Contract Ending Date
6/17/2025
Contract Document Type
Contract
Amount
$3,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 7 of 7 <br /> <br />Brady’s site superintendent will advise your designated point of contact of any work which may affect the safety of your <br />personnel, process, products or property. Our safety coordinator will conduct periodic audits of our operations. This <br />includes continuous housekeeping and safety reviews of the work area. <br />Brady excludes any testing, identification, removal, or disposal of hazard materials such as but not limited to asbestos. <br /> <br />Project Turn Over <br />Brady will hold a preconstruction meeting with the owner’s designated personnel to discuss and review the project scope <br />of work, discuss any long lead items, and conduct a site visit before work begins. It shall be the owner’s responsible to <br />inform Brady of any special sequencing or phased construction requirements, special hours for construction based on <br />owner building occupancy, and/or delivery time line as related to project start and completion dates. <br />The owner is responsible for informing Brady of any facility security regulations and requirements, parking arrangements, <br />requirements for entering and leaving the facility, special rules regarding personnel, vehicles, tools and equipment, and <br />hazard materials on site that we may come in contact with or working in close proximity to. <br /> <br />Project Close Out <br />After competition of project and prior to turning the area and equipment over to the owner, a final inspection shall <br />be conducted by the owner’s designate personnel and Brady's onsite superintendent to ensure project has been <br />completed to the owner’s standards. <br /> <br />Confidentiality Disclosure <br />The contents of this document are considered proprietary and confidential. This information is to be maintained in <br />confidence and should not be disclosed to others including but not limited to, competitors, customers and suppliers. Any <br />unauthorized use, disclosure or duplication of this information without written consent of Brady is strictly prohibited. <br /> <br /> <br /> <br /> <br /> <br /> <br />Equipment Coverage and Services <br />Docusign Envelope ID: 8CA14150-9530-4A99-BD60-9C85B08D1654
The URL can be used to link to this page
Your browser does not support the video tag.