Browse
Search
2025-337-E-AMS-Brady Services-TAB for RTU 2 & 3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-337-E-AMS-Brady Services-TAB for RTU 2 & 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 7:58:51 AM
Creation date
6/26/2025 7:58:47 AM
Metadata
Fields
Template:
Contract
Date
6/11/2025
Contract Starting Date
6/11/2025
Contract Ending Date
6/17/2025
Contract Document Type
Contract
Amount
$3,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 6 of 7 <br /> <br /> <br />Duke Energy Rebate Program <br />If Duke Energy is your utilities provider ask Brady how we can help you participate in Duke’s Smart Saver program for <br />Rebates and Incentives when replacing your HVAC equipment with high-efficiency equipment and lighting. If your <br />company is eligible to participate, these rebates and incentives can be assigned to you, the owner, or to Brady to help <br />offset the first cost of your project. You will see the benefits of the energy savings for many years. Brady will file the online <br />application for any rebates or incentives that apply with the program on your behalf. <br /> <br />3D Point Cloud Scanning Instructional Video <br />3D Point Cloud Scanning is creating remarkable opportunities for retrofitting and mechanical documentation. This <br />technology is used in the development of design prefabrication drawings for a customer and allows them to view a map of <br />the final installation before the project even begins. Due to the extensive measurements created from the 3D Point Cloud <br />Scanning, a majority of the work can be completed off-site, significantly shortening the installation duration on-site <br />compared to conventional approaches. Brady is committed to staying at the forefront of innovation and will continue to <br />implement tools like this to serve our customers more effectively. <br />Check out our informational video: https://youtu.be/k2q4Gp_0DAw <br /> <br />Work Area <br />Brady should have free and clear access to the work area. All work is to be continuous any project delays requiring Brady <br />to leave and remobilize to the site could add additional cost to the project. <br />All Brady personnel and subcontractors shall take all means necessary to ensure that all debris are disposed of, and the <br />work area is kept clean to guard against fire and safety hazards as well as to provide a more efficient work area. <br /> <br />Safety <br />Brady provides multiple safety training opportunities for our Associates to increase knowledge and communicating <br />experience concerning workplace health and safety, in order to build their competence in hazard recognition and control. <br />On an ongoing basis, Brady conducts OSHA 10 hour course for all field associates and 30 hour course for all <br />superintendents as well as conducting concentrated training on all specific safety topics related to our industry. <br /> <br /> <br />Docusign Envelope ID: 8CA14150-9530-4A99-BD60-9C85B08D1654
The URL can be used to link to this page
Your browser does not support the video tag.