Browse
Search
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:44:12 PM
Creation date
6/12/2025 3:42:58 PM
Metadata
Fields
Template:
Contract
Date
6/4/2025
Contract Starting Date
6/4/2025
Contract Ending Date
6/11/2025
Contract Document Type
Contract
Amount
$2,729,399.34
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, NC <br /> <br />On-Premise OnCall Dispatch Implementation <br />Statement of Work 88 <br />Attachment C – Initial Project Schedule <br /> <br />TASK NAME DURATION BUSINESS DAYS <br />SINCE START <br />On-Prem OnCall Dispatch Project Schedule 400 days 0 days <br /> Planning Phase 45.38 days 0 days <br /> Project Kickoff Meeting 3.5 days 20 days <br /> COTS Interface Questionnaire Completion 5.5 days 27.25 days <br /> OnCall Dispatch & Mobile Unit Launch 6.5 days 28.5 days <br /> OnCall Dispatch GIS Requirements Review 1.13 days 28.5 days <br /> Custom Interface Development 6.75 days 38.63 days <br /> Load Balancer Equipment Ordering 0.25 days 23.5 days <br /> Staging Phase 108.88 <br />days 23.75 days <br /> Physical Infrastructure Installation 1 day 35.25 days <br /> Virtual Server and OnCall Software Staging 11.39 days 41.25 days <br /> OnCall Dispatch GIS Consulting 21.13 days 52.64 days <br /> OnCall Dispatch System Build 1 18.25 days 73.77 days <br /> OnCall Dispatch Deployment and Response Planning <br />Workshop 14.98 days 97.02 days <br /> OnCall Dispatch System Build 2 15 days 117 days <br /> Configuration Phase 324.25 <br />days 132.63 days <br /> OnCall Dispatch Fundamentals for Core Team 6 days 137 days <br /> COTS Interface Product Installation and Configuration 137.63 <br />days 132 days <br /> CommSys ConnectCIC Installation 5.25 days 137.63 days <br /> OnCall Dispatch Configuration Consulting 1 18.25 days 148 days <br /> OnCall Dispatch Configuration Consulting 2 15.75 days 171.25 days <br /> OnCall Dispatch Configuration Consulting 3 14.25 days 196.75 days <br /> OnCall Dispatch | Mobile Unit Configuration Consulting <br />Session - Law 15 days 216 days <br /> OnCall Dispatch | Mobile Unit Configuration Consulting <br />Session - Fire 18 days 227 days <br /> OnCall Dispatch | Mobile Responder Configuration - Law 2 days 221 days <br /> OnCall Dispatch | Mobile Responder Configuration - Fire 2 days 235 days <br /> OnCall Dispatch Archive Database Staging 0.25 days 317 days <br /> OnCall Analytics - Dispatch Configuration 7 days 317.25 days <br /> Custom Interface Product Installation and Configuration 7 days 166.25 days <br /> Standard Interface Product Installation and Configuration 1 day 211 days <br /> Testing Phase 174 days 143 days <br /> Test Plan and Test Cases Development - OnCall Dispatch 0 days 143 days <br /> Customer Functional Testing - OnCall Dispatch 45 days 271.75 days <br />Docusign Envelope ID: 463E937D-8F02-4D22-9EEA-B2B50627D9E0Docusign Envelope ID: DE681D27-7D55-4FB6-8C51-9394D26FBC9EDocusign Envelope ID: 295A5D15-51E9-4D4A-ABF7-42411BB309FA
The URL can be used to link to this page
Your browser does not support the video tag.