Browse
Search
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:44:12 PM
Creation date
6/12/2025 3:42:58 PM
Metadata
Fields
Template:
Contract
Date
6/4/2025
Contract Starting Date
6/4/2025
Contract Ending Date
6/11/2025
Contract Document Type
Contract
Amount
$2,729,399.34
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, NC <br /> <br />On-Premise OnCall Dispatch Implementation <br />Statement of Work 72 <br /> <br />Approval Signatures <br />Signature by all parties listed below constitutes acceptance of and notice to proceed with this SOW, in <br />accordance with this SOW and the GSA Contract. <br />This SOW may be executed in one or more counterparts, each of which shall be deemed to be original, <br />and all of which together shall constitute one and the same agreement. A signature delivered by facsimile <br />shall be deemed to be an original signature and shall be effective upon receipt thereof by the other party. <br />This SOW together with the GSA Contract constitutes the entire agreement between the Parties. This <br />SOW may not be amended or modified unless done so in a writing signed by authorized representatives <br />of both Parties. The pre-printed terms and conditions a purchase order or any other terms and conditions <br />of a Customer purchase order shall be void and shall not constitute a change to this SOW or the GSA <br />Contract. <br />This document is approved by: <br />AUTHORIZED HEXAGON SIGNATURE <br />Name: Tiffany Taylor, North America Finance Director <br />Signature: Date: <br /> <br /> <br />AUTHORIZED CUSTOMER SIGNATURE <br />Name: <br />Title: <br />Signature: Date: <br /> <br /> <br /> <br />Docusign Envelope ID: 463E937D-8F02-4D22-9EEA-B2B50627D9E0Docusign Envelope ID: DE681D27-7D55-4FB6-8C51-9394D26FBC9E <br />9/16/2024 <br />Jamezetta Bedford <br />Chair, BOCC <br />9/26/2024 <br />Docusign Envelope ID: 295A5D15-51E9-4D4A-ABF7-42411BB309FA
The URL can be used to link to this page
Your browser does not support the video tag.