Browse
Search
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:44:12 PM
Creation date
6/12/2025 3:42:58 PM
Metadata
Fields
Template:
Contract
Date
6/4/2025
Contract Starting Date
6/4/2025
Contract Ending Date
6/11/2025
Contract Document Type
Contract
Amount
$2,729,399.34
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, NC <br /> <br />On-Premise OnCall Dispatch Implementation <br />Statement of Work 66 <br />34. System Readiness Review <br />Task Description <br />During this Task Hexagon technical resources, the Hexagon Project Manager, and the Customer team <br />will meet and determine if the OnCall Subsystems are ready for Cutover. <br />In addition, the System Readiness Review verifies that the following has occurred: <br /> A document titled, “Cutover Plan” has been developed and approved by both Hexagon and the <br />Customer; <br /> Establishment and approval of a schedule for Cutover Activities; and <br /> Identification and scheduling of Hexagon and Customer resources required for Cutover Activities. <br />Task Deliverables <br /> Readiness Review meeting minutes <br /> Discussion notes on the results from Hexagon’s final review of the system <br />Task Prerequisites <br /> Cutover Plan Task is complete. <br />Task Assumptions <br /> The Customer certifies it has trained all personnel who will be utilizing the system. <br />Hexagon Team Participation and Responsibilities <br />Hexagon shall: <br /> Conduct a conference call to discuss if the system is ready to perform Cutover; <br /> Provide system Cutover notification to appropriate internal and external interface stakeholders <br />supplying systems integral to Cutover operations; <br /> Review and provide timely feedback/approval of Cutover Plan; and <br /> Work with Customer to determine suitable Cutover schedule. <br />Customer Team Participation and Responsibilities <br />Customer shall: <br /> Participate in the conference call; <br /> Notify internal and external interface stakeholders about pending Cutover; <br /> Review and provide timely feedback/approval of Cutover Plan; and <br /> Work with Hexagon to determine suitable Cutover schedule. <br />Task Acceptance Criteria <br />This Task is complete when the Readiness Review has been conducted. <br />Docusign Envelope ID: 463E937D-8F02-4D22-9EEA-B2B50627D9E0Docusign Envelope ID: DE681D27-7D55-4FB6-8C51-9394D26FBC9EDocusign Envelope ID: 295A5D15-51E9-4D4A-ABF7-42411BB309FA
The URL can be used to link to this page
Your browser does not support the video tag.