Browse
Search
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:44:12 PM
Creation date
6/12/2025 3:42:58 PM
Metadata
Fields
Template:
Contract
Date
6/4/2025
Contract Starting Date
6/4/2025
Contract Ending Date
6/11/2025
Contract Document Type
Contract
Amount
$2,729,399.34
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, NC <br /> <br />On-Premise OnCall Dispatch Implementation <br />Statement of Work 61 <br /> System Code Freeze <br />Task Prerequisites <br /> Customer and Hexagon mutually confirm that OnCall Dispatch and Mobile Unit are ready for <br />testing. <br /> Test Plan and Test Cases Development – OnCall Dispatch Task is complete. <br />Hexagon Team Participation and Responsibilities <br />Hexagon shall: <br /> Verify all applicable software, systems and ancillary systems, including the redundancy of <br />Production system (if applicable), are ready for Functional Testing; <br /> Provide support during Functional Testing; <br /> Review Defects filed by the Customer; and <br /> Resolve Blocker Defects filed by the Customer. <br />Customer Team Participation and Responsibilities <br />Customer shall: <br /> Verify all applicable software, systems and ancillary systems, including the redundancy of <br />Production system (if applicable), are ready for Functional Testing; <br /> Execute the CAD Test Plan; and <br /> Track and document results from executed Test Cases and file any Blocker Defects in the CRM <br />system by the end of the CAD Reporting Period. <br />Task Acceptance Criteria <br />This Task is complete upon expiration of the CAD Testing Period and resolution of all Blocker Defects <br />reported by the end of the CAD Reporting Period. <br /> <br />Docusign Envelope ID: 463E937D-8F02-4D22-9EEA-B2B50627D9E0Docusign Envelope ID: DE681D27-7D55-4FB6-8C51-9394D26FBC9EDocusign Envelope ID: 295A5D15-51E9-4D4A-ABF7-42411BB309FA
The URL can be used to link to this page
Your browser does not support the video tag.