Browse
Search
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:44:12 PM
Creation date
6/12/2025 3:42:58 PM
Metadata
Fields
Template:
Contract
Date
6/4/2025
Contract Starting Date
6/4/2025
Contract Ending Date
6/11/2025
Contract Document Type
Contract
Amount
$2,729,399.34
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, NC <br /> <br />On-Premise OnCall Dispatch Implementation <br />Statement of Work 59 <br />Testing Phase <br />29. Test Plan and Test Cases Development <br />Task Description <br />During this Task, the Customer will create a test plan (“CAD Test Plan”) with Test Cases for OnCall <br />Dispatch. The CAD Test Plan and Test Cases are essential for the Customer to be able to validate and <br />prove the functionality of the Dispatch Subsystem. Every Benchmark Criteria corresponding to OnCall <br />Dispatch should have at least one Test Case; some Benchmark Criteria may have multiple associated <br />Test Cases. The Customer will identify the Benchmark Criteria that correspond to the applicable Test <br />Cases. A clear pass/fail criterion must be defined for each Test Case. The Test Plan and Test Cases will <br />be agency-specific, and work-process driven with clearly documented Pass/Fail criteria. Only the <br />elements of the Test Plan and Test Cases conforming with the Benchmark Criteria shall be used in <br />evaluating and testing the Subsystem. The Test Plan is the set of Test Cases that will serve as the basis <br />of testing the fully configured Subsystem, including interfaces. <br />The Customer will not need a fully configured Subsystem to create the Test Plan and Test Cases. The <br />Test Case creation should be accomplished using a workflow-based Test Case. <br />Task Deliverables <br /> Customer’s CAD Test Plan and Test Cases <br />Task Prerequisites <br /> OnCall Dispatch Fundamentals for Core Team Task is complete. <br />Task Assumptions <br /> N/A <br />Hexagon Team Participation and Responsibilities <br />Hexagon shall: <br /> Consult with the Customer during the Test Plan and Test Cases creation Task to validate the Test <br />Cases correspond to the Benchmark Criteria (applicable to Dispatch). <br />Customer Team Participation and Responsibilities <br />Customer shall: <br /> Create the CAD Test Plan and Test Cases consistent with the Benchmark Criteria; and <br /> Provide CAD Test Plan and Test Cases to Hexagon. <br />Task Acceptance Criteria <br />This Task is complete when the Customer has created the CAD Test Plan and Test Cases and Hexagon <br />has validated the same in accordance with the Benchmark Criteria. <br /> <br />Docusign Envelope ID: 463E937D-8F02-4D22-9EEA-B2B50627D9E0Docusign Envelope ID: DE681D27-7D55-4FB6-8C51-9394D26FBC9EDocusign Envelope ID: 295A5D15-51E9-4D4A-ABF7-42411BB309FA
The URL can be used to link to this page
Your browser does not support the video tag.