Browse
Search
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:44:12 PM
Creation date
6/12/2025 3:42:58 PM
Metadata
Fields
Template:
Contract
Date
6/4/2025
Contract Starting Date
6/4/2025
Contract Ending Date
6/11/2025
Contract Document Type
Contract
Amount
$2,729,399.34
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, NC <br /> <br />On-Premise OnCall Dispatch Implementation <br />Statement of Work 22 <br /> Connect the HP ILO or Dell iDRAC, assigning an IP Address and\or license to those to allow <br />remote access; <br /> Make connections between the servers and storage, as required; <br /> Assign an IP Address to the storage array to allow connectivity for full configuration; <br /> Connect to the servers license the hypervisor host OS if required; <br /> Configure storage to be presented to the hosts; <br /> Configure the networking on each host to provide two (2) virtual switches each configured with <br />two (2) NICs. The first virtual switch will support hypervisor management connectivity and VM <br />migration (10 gig). The second virtual switch will support the Production VM traffic (1 gig); and <br /> Configure the virtual switch that will be utilized by the virtual Kemp load balancers to change the <br />following settings: <br /> MAC address changes from reject to accept. <br /> Forged Transmits from reject to accept. <br /> Answer other configuration questions as they arise. <br />Task Acceptance Criteria <br />This Task is complete when: (i)(a) Customer has all designated Project server hardware staged and (b) <br />the physical servers and storage that will host the virtual environments configured and, (ii) Hexagon has <br />provided the VM templates to the Customer. <br /> <br />Docusign Envelope ID: 463E937D-8F02-4D22-9EEA-B2B50627D9E0Docusign Envelope ID: DE681D27-7D55-4FB6-8C51-9394D26FBC9EDocusign Envelope ID: 295A5D15-51E9-4D4A-ABF7-42411BB309FA
The URL can be used to link to this page
Your browser does not support the video tag.