Browse
Search
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-318-E-Emergency Svc-Hexagon Safety, Infrastructure, & Geospatial-CAD Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:44:12 PM
Creation date
6/12/2025 3:42:58 PM
Metadata
Fields
Template:
Contract
Date
6/4/2025
Contract Starting Date
6/4/2025
Contract Ending Date
6/11/2025
Contract Document Type
Contract
Amount
$2,729,399.34
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, NC <br /> <br />On-Premise OnCall Dispatch Implementation <br />Statement of Work 117 <br />“Software Requirements” means the functionality and capabilities affirmatively included in the OnCall <br />Software as expressly specified in OnCall Functional Matrix (Attachment G, as appropriate to the <br />Subsystem). <br />“SR” or “Service Request” a request logged into Hexagon’s Help Desk Portal identifying a request for <br />Hexagon to address a Defect, question, provide an Update, or provide an enhancement request, among <br />other requests. <br />“Subject Matter Expert” or “SME” means a person(s) who has particular knowledge about a specific <br />topic(s). <br />“System Administrator(s)” means a person or persons having the appropriate education, training, <br />and/or experience in information technology to provide first tier support of the System. <br />“Task Prerequisites” means those events, deliverables, or accomplishments that are required to occur <br />prior to the commencement of the applicable Task, except as may otherwise be agreed to through <br />Conditional Acceptance. <br />“Test Case” means a set of conditions and parameters agreed to by the Parties which the Parties shall <br />use to test whether the intended functionality identified in the Benchmark Criteria is reflected in the <br />System. <br />“Test Case Failure” means a situation in which an executed Test Case has substantially failed in <br />meeting the passage criteria set forth in the applicable portion of the Benchmark Criteria. <br />“Updated Initial Project Schedule” means the Initial Project Schedule updated by the Parties’ Project <br />Managers during Project Kickoff Meeting Task and reflecting the actual Notice to Proceed date. <br />“VPN” means virtual private network. <br />“Warranty Period” means that one (1) year period beginning at Cutover for a Subsystem during which <br />the applicable Project Software is subject to the warranty described in Attachment K. <br /> <br /> <br />Docusign Envelope ID: 463E937D-8F02-4D22-9EEA-B2B50627D9E0Docusign Envelope ID: DE681D27-7D55-4FB6-8C51-9394D26FBC9EDocusign Envelope ID: 295A5D15-51E9-4D4A-ABF7-42411BB309FA
The URL can be used to link to this page
Your browser does not support the video tag.