Browse
Search
2025-284-E-AMS-Brady Trane Services-Sportsplex - Replace two boilers
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-284-E-AMS-Brady Trane Services-Sportsplex - Replace two boilers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:27:49 PM
Creation date
6/12/2025 3:27:25 PM
Metadata
Fields
Template:
Contract
Date
6/6/2025
Contract Starting Date
6/6/2025
Contract Ending Date
6/10/2025
Contract Document Type
Contract
Amount
$91,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 6 of 13 <br /> <br /> <br />Hot Water Pool Heater Boiler Scope Of Work <br /> <br />Equipment Demolition, Installation and Specification <br />Brady will disconnect all power wiring, control wiring, gas piping, vent piping, and hot water <br />piping as needed for removal and disposal of the existing Raypak HW Pool Heater Boiler <br /> <br />Brady will include all labor, accessories, tool, equipment, and materials required to completely <br />execute the installation of a new Camus HW Pool Heater boiler. <br /> <br />Boiler specifications are listed below: <br /> <br />• COMP Pool <br />Camus Boiler Model: <br />Boiler Model: BlueFlame <br />Boiler Type: Domestic Hot Water <br />Boiler Style: Non-Condensing <br />Boiler Capacity: 1200 <br />Fuel Series: Natural Gas <br />Burner Modulation: 2 Stage <br />Boiler Heat Exchanger Type: Cu-Ni <br />Boiler Mounting Type: Floor Mounted <br />Application Environment: Indoor - Typical Boiler Room <br />Design Pressure: 160lb HW <br />Boiler Safety Valve Setpoint: 125lb <br />System Voltage: 120/1/60 <br />Altitude: 700 feet <br />Water Connection Location: Left feet <br />Gas Connection Location: Left feet <br />CSD-1 / GE Gap with 115v LWCO <br />Selected voltage: 120/1/60 <br />High Gas Pressure Switch (Included) <br />Low Gas Pressure Switch (Included) <br /> <br /> <br />Pipe, Valves, Fittings <br />This proposal is based on the existing gas isolation valve being in good working order so the <br />existing gas supply can be isolated for removal of existing boiler and installation of the new <br />boiler. <br /> <br />Brady will furnish and install all pipe, manual valves, and fittings as required to connect gas <br />piping to the gas train provided with the new boiler, vent piping from gas train to be terminated <br />outside the boiler room. <br /> <br />All new gas piping 2" and smaller willl be T&C schedule 40 carbon steel pipe, with screwed <br />fittings of the same materials and weight as the piping in which they are installed. <br /> <br />Brady will furnish and install all pipe, manual valves, and fittings as required to connect vent <br />piping to the new gas train and terminate outside the boiler room. <br /> <br />All new vent piping 2" and smaller willl be T&C schedule 40 carbon steel pipe, with screwed <br />fittings of the same materials and weight as the piping in which they are installed. <br /> <br />Brady will furnish and install all pipe, manual valves, and fittings as required to connect the hot <br />water loop to the new boiler. This proposal is based on the existing hot water isolation valve <br />Docusign Envelope ID: 5D3281C9-5430-4348-AA7E-D321F0554D43
The URL can be used to link to this page
Your browser does not support the video tag.