2025-284-E-AMS-Brady Trane Services-Sportsplex - Replace two boilers
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-284-E-AMS-Brady Trane Services-Sportsplex - Replace two boilers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:27:49 PM
Creation date
6/12/2025 3:27:25 PM
Metadata
Fields
Template:
Contract
Date
6/6/2025
Contract Starting Date
6/6/2025
Contract Ending Date
6/10/2025
Contract Document Type
Contract
Amount
$91,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 4 of 13 <br /> <br />All new gas piping 2" and smaller willl be T&C schedule 40 carbon steel pipe, with screwed <br />fittings of the same materials and weight as the piping in which they are installed. <br /> <br />All new vent piping 2" and smaller willl be T&C schedule 40 carbon steel pipe, with screwed <br />fittings of the same materials and weight as the piping in which they are installed. <br /> <br />Brady will furnish and install all pipe, manual valves, and fittings as required to connect the hot <br />water loop to the new boiler. This proposal is based on the existing hot water isolation valve <br />being in good working order so the existing hot water loop can be isolated for removal of <br />existing boiler and installation of the new boiler. <br /> <br />All new hot water piping 2" and smaller willl be T&C schedule 40 carbon steel pipe, with <br />screwed fittings of the same materials and weight as the piping in which they are installed. <br /> <br />Brady will furnish and install all pipe, manual valves, and fittings as required to connect Make- <br />up water to the new boiler. This proposal is based on the existing make-up water isolation valve <br />being in good working order so the existing make-up water can be isolated for removal of <br />existing boiler and installation of the new boiler. <br /> <br />Hangers and Supports <br />Brady will furnish and install all pipe hangers and supports as required to support the pipe <br />independently from the boiler. <br /> <br />Electrical <br />Brady will replace existing disconnect, conduit, and conductors that is required for load side <br />electrical service from point of existing disconnect to new boiler. Brady will reuse existing <br />breaker, conduit, and conductors on line side. Disconnect, conduit, and conductors have been <br />sized per the NEC based on the boiler motor HP provided to Brady per the equipment <br />manufacture. <br /> <br />Electrical connection to equipment and motors shall be made with short lengths of flexible <br />"Liquid - Tite" conduit. <br /> <br />All equipment has been selected for 120 volt, 60 hertz, and 3 phase electrical service. <br /> <br />Brady will provide nameplates for identification of all equipment, motor starters, disconnect <br />switches. <br /> <br />Controls <br />Brady excludes any controls work for this project, including connecting the boiler to a front end <br />energy management system, programming, and graphic up-grade. <br /> <br />Pipe Insulation <br />All hot water piping will be insulated to match existing. <br /> <br />Crane and Rigging <br />Brady will furnish all crane, rigging and trucking as needed for this project. <br /> <br />Upon receipt of equipment on the job site, Brady will inspect the unit for possible damage <br />during transit. This will include an inspection of unit exterior, all doors, access panels and <br />openings. If damage has occurred it will be immediately reported to the delivering carrier <br />and the damage noted on the receiving copy of the bill of lading. <br /> <br />Start-Up <br />Brady’s technician will perform start-up and inspection of the new boiler according to the <br />manufactures written instructions. <br />Docusign Envelope ID: 5D3281C9-5430-4348-AA7E-D321F0554D43