Orange County NC Website
<br /> <br />Page 3 of 13 <br /> <br /> <br /> <br />Thank you for choosing Brady as your HVAC support partner. We are committed to working with you to ensure your <br />building serves the needs of your organization. We appreciate the opportunity to provide you with a proposal for your <br />equipment replacement as detailed in the following pages. This proposal is based on our site visit and information <br />provided by the owner for the installation of the new equipment. Any revision or request of change to scope of work by the <br />owner at a later date would be subject to price review at that time. <br /> <br />Hot Water Boiler Scope Of Work <br /> <br />Equipment Demolition, Installation and Specification <br />Brady will disconnect all power wiring, control wiring, gas piping, vent piping, and hot water <br />piping as needed for removal and disposal of the existing Raypak HW boiler. <br /> <br />Brady will include all labor, accessories, tool, equipment, and materials required to completely <br />execute the installation of a new Raypak HW boiler. <br /> <br />Boiler specifications for the new Hot Water Domestic Boiler below: <br /> <br /> COMP Pool <br />• Camus Boiler Model: <br />Boiler Model: BlueFlame <br />Boiler Type: Domestic Hot Water <br />Boiler Style: Non-Condensing <br />Boiler Capacity: 1200 <br />Fuel Series: Natural Gas <br />Burner Modulation: 2 Stage <br />Boiler Heat Exchanger Type: Cu-Ni <br />Boiler Mounting Type: Floor Mounted <br />Application Environment: Indoor - Typical Boiler Room <br />Design Pressure: 160lb HW <br />Boiler Safety Valve Setpoint: 125lb <br />System Voltage: 120/1/60 <br />Altitude: 700 feet <br />Water Connection Location: Left feet <br />Gas Connection Location: Left feet <br />CSD-1 / GE Gap with 115v LWCO <br />Selected voltage: 120/1/60 <br />High Gas Pressure Switch (Included) <br />Low Gas Pressure Switch (Included) <br /> <br />Pipe, Valves, Fittings <br />This proposal is based on the existing gas isolation valve being in good working order so the <br />existing gas supply can be isolated for removal of existing boiler and installation of the new <br />boiler. <br /> <br />Brady will furnish and install all pipe, manual valves, and fittings as required to connect gas <br />piping to the gas train provided with the new boiler, vent piping from gas train to be terminated <br />outside the boiler room. <br /> <br />Docusign Envelope ID: 5D3281C9-5430-4348-AA7E-D321F0554D43