Browse
Search
OUTBoard Jun 16 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Jun 16 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 10:35:12 AM
Creation date
6/12/2025 10:32:14 AM
Metadata
Fields
Template:
BOCC
Date
6/15/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> BP7-R007 Replace Bridge #63 on Pleasant Green Road 9/5/2030 FY2033 $2,550,000 Planning and design activities underway Daniel Dagenhart <br /> 1-0305B Interchange improvements at 1-85 and SR 1009 (South 10/15/2030 FY2033 $102,200,000 PE funding approved 9/8/17, Planning and Colin Mellor <br /> 34142.1.5 Churton Street) in Hillsborough Design activities underway, Coordinate with <br /> 34142.3.3 <br /> I-0305 and U-5845. (I-0305B was formerly <br /> 34142.3.4 <br /> 34142.2.4 5967) <br /> R-5821A Construct operational improvements including 1/1/2040 post years $21 ,650,000 PE funding approved 10/10/17, design Suzana Matta <br /> 47093.1 .2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, <br /> 47093.2.2 (Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville Coordinating with NC54 West Corridor <br /> 47093.3.2 Road). Study <br /> 1-0305(A) Widening of 1-85 from west of SR1006 (Orange Grove Road) 1/1/2040 post years $132,000,000 PE funding approved 6/5/18, Planning and Colin Mellor <br /> 34142.1 .2 in Orange Co. to west of SR 1400 (Sparger Road) in Orange design activities underway, Project <br /> 34142.2.2 Co. reinstated per 2020-2029 STIP (funded <br /> 34142.3.2 project) and delete project 1-5983 <br /> 1-0305C Interchange improvements at 1-85 and NC 86 in 1/1/2040 post years $20,900,000 PE funding approved 10/10/17, Planning Colin Mellor <br /> 34142.1 .6 Hillsborough and Design activities underway, 1-0305C <br /> was formerly 1-5984. <br /> C-5181 Jones Creek Greenway Project - Fill Gap between the TBD TBD $910,000 Environmental document approved Alex Stankovic <br /> Carrboro Upper Bolin Trail and Twin Creeks Greenway and 8/14/23. NCDOT reviewing 90% plans. <br /> also implement program to support on-vehicle trips to Morris <br /> Grove Elementary School <br /> EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro TBD TBD $1 ,568,000 Review comments provided to Carrboro in Alex Stankovic <br /> June 2023 for revisions and resubmittal. <br /> Resubmittal under review. CE under <br /> review. <br /> Page 4 TWTPO April 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.