Browse
Search
OUTBoard Jun 16 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Jun 16 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 10:35:12 AM
Creation date
6/12/2025 10:32:14 AM
Metadata
Fields
Template:
BOCC
Date
6/15/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> HO-0013 Chapel Hill from Franklin Street and Rosemary Street, and 2/26/2026 FY28 $2,100,000 Project approved by BOT and assigned. Alex Stankovic <br /> 51177.1.1 the streets in between from Merritt Mill Road to Henderson Municipal agreement executed. <br /> 51177.2.1 Street in downtown Chapel Hill. Install new mast arm and <br /> 51177.2.2 <br /> 51177. .1 curb and sidewalk improvements. <br /> C-5650 Construct sidewalk on one side of SR 1919 (Smith Level 4/9/2026 FY2028 $2,749,000 Carrboro approved to incorporate water line Alex Stankovic <br /> Road/S. Greensboro St.) from Public Works Drive to the work into design. Env doc returned w <br /> northern end of Old Pittsboro Road in Carrboro comments on 12/10/21 . Document to be <br /> updated to include additional limits for <br /> resurfacing. NCDOT waiting on revised <br /> 1-3306AC 1-40 at NC 86 - Upgrade to superstreet from Northwood Drive 5/19/2026 FY2029 $10,970,000 Planning and design activities underway Radha Attaluri <br /> to Ramp C/D at 1-40 interchange <br /> BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 9/17/2026 FY2029 $2,900,000 Planning and design activities underway Daniel Dagenhart <br /> ROW acquisisition complete. <br /> EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from south 10/1/2026 FY2028 $3,968,000 Municipal agreement executed and project Alex Stankovic <br /> of Norfolk Southern Railroad to NC 86 (MLK Jr. Blvd.) in development underway. <br /> Chapel Hill <br /> 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $9,500,000 Planning and design activities pending Trung Nguyen <br /> 45910.1 .1 (Buckhorn Road) to West of SR 1006 (Orange Grove Road) <br /> 45910.3.1 <br /> B-6037 Replace Bridge #49 over Norfolk Southern Railway on NC 86 4/20/2027 FY2031 $14,080,000 Planning and design activities underway. Brandon Green <br /> 25% Plans complete. <br /> BP7-R013 Replace Bridge #90 on SR 1940 (Damascus Church Road) 9/16/2027 FY2030 $2,220,000 Planning and design activities underway Daniel Dagenhart <br /> Plans at 25% <br /> Page 2 TWTPO April 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.