Orange County NC Website
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start CompletionDate Date Cost Status Project Lead <br /> 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/20/25 FY2027 $48,000,000 Planning and design activities Brian Ketner <br /> 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway. CMGC delivery. <br /> 48689.2.1 <br /> 48689.3.1 <br /> U-6009 Widen and construct center turn lane on US70(West Church 1/15/30 FY2032 $52,000,000 Planning and design activities Suzana Matta <br /> 47144.1.1 St)from Tarleton Ave.to Fifth Street in Burlington underway <br /> 47144.2.1 <br /> 47144.3.1 <br /> BP7-R023 Replace Bridge#238 on SR 2128(Old Hillsborough Road) 9/18/31 FY2033 $720,000 Planning and design activities Daniel Dagenhart <br /> underway <br /> BP7-R018 Replace Bridge#254 on SR 2104(Mandate Road) 10/7/32 FY2034 $710,000 Planning and design activities Daniel Dagenhart <br /> underway <br /> BP7-R019 Replace Bridge#103 on SR 2182(Perry Road) 10/21/32 FY2034 $710,000 Planning and design activities Daniel Dagenhart <br /> underway <br /> U-6114 Install traffic signal and add turn lanes at NC 62(Alamance 1/1/40 post years $2,210,000 Planning and design activities Brandon Green <br /> Road)at SR 1155(Hatchery Road)/Bonnie Lane intersection pending.(Funded for Prelim. <br /> in Burlington Engineering only) <br /> 1-6009 Interchange improvements at 1-40/1-85 and SR 1158(Huffman 1/1/40 post years $1,800,000 Planning and design activities Brandon Green <br /> 47962.1.1 Mill Road). Construct additional right turn lane on 1-40 WB pending.(Funded for Prelim. <br /> 47962.2.1 Ramp and improve operations at SR 1308(Garden Road) Engineering only) <br /> 47962.3.1 intersection in Burlington <br /> SS-6207AA NC 62 at SR 1002(Jeffries Cross Road),north of Green TBD TBD $25,000 Planning and design activities Dawn McPherson <br /> 51338 Level.Convert intersection to all way stop control. underway <br /> BGMPO Mar 2025 <br /> Page 3 <br />