Browse
Search
OUTBoard Jun 16 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Jun 16 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 10:35:12 AM
Creation date
6/12/2025 10:32:14 AM
Metadata
Fields
Template:
BOCC
Date
6/15/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST# FY 2026 FY START DATE <br /> Orange Transit Work Plan Jul 2025 <br /> 4-26TOCCDI Request Form Total Project Cost <br /> Operating and/or Capital $ 276,194 <br /> Orange Transit Estimated <br /> Project Name Requesting Agency Project Contact Operating Cost <br /> Base Year $ - <br /> 203 Connector Sidewalk Town of Carrboro Tina Moon FY 2027 $ - <br /> cmoon carrboronc. ov Cumulative $ - <br /> Estimated Orange Transit Estimated Capital <br /> Estimated Start Date Completion Notes Cost <br /> Jul-25 Jun-27 Base Year $ 120,283 <br /> Cumulative $ 276,194 <br /> Project Enter below a summary of the project that may later be used as the project description in <br /> Description/Scope the FY 2026 Work Plan. <br /> Design and construct a 6-foot wide meandering sidewalk to connect the new Drakeford Library Complex (203 South <br /> Green/Roberson St)to East Main St, and construct a new bus shelter pad at East Main as part of the installation of new <br /> enhanced bus shelters for Chapel Hill Transit and GoTriangle (405 to Durham). <br />
The URL can be used to link to this page
Your browser does not support the video tag.