Browse
Search
Agenda 06-17-2025; 8-m - Amendment to the Purchase and Sale Agreement for the Property for the Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 06-17-2025 Business Meeting
>
Agenda 06-17-2025; 8-m - Amendment to the Purchase and Sale Agreement for the Property for the Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 10:25:36 AM
Creation date
6/12/2025 10:27:28 AM
Metadata
Fields
Template:
BOCC
Date
6/17/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-m
Document Relationships
Agenda for June 17, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 06-17-2025 Business Meeting
ORD-2025-022- Approval of Fiscal Year 2025-26 Budget Ordinances and County Fee Schedule
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-023-Fiscal Year 2024-25 Budget Amendment #11
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-055-Specialty Warranty Deed to Orange County
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-059-Approval of the Visitors Bureau’s FY 2025-26 Marketing Agreement with Clean, Inc
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-060- Approval of the Visitors Bureau’s FY 2025-26 Agreement with Media Two Interactive, LLC
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-061-Contract Renewal with Siemens for HVAC Controls and Building Automation Services for FY 2025-26
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-062-JCPC Certification and County Plan for FY 2025-2026
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-063-County funding Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-065- Approval of North Carolina Local Government Commission Audit Contract with Mauldin & Jenkins, LLC
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-024-Proclamation Honoring Jason Johnson as the 2025 Wells Fargo NC principal of the year
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-032-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> the Woodsedge Front Pump Station. The Easement area to be conveyed is shown as "25' Town of <br /> Hillsborough Sanitary Sewer Easement" (see Plan Set Sheet C4.0 of Exhibit A). (See also attached <br /> Exhibit C,Town of Hillsborough Sewer Easement form to be finalized and approved by Buyer and Town <br /> post-Closing.) <br /> 2. STORMWATER EASEMENTS. <br /> a. Permanent Underground Stormwater Detention Facility. The Declaration (with <br /> easements)will provide stormwater drainage easements in favor of the Seller to run stormwater drainage <br /> piping from New Lot 1 to the permanent underground detention facility under the private road just south <br /> of New Lot 1 (see Plan Set Sheet C.2.1, Exhibit A). The easement will stipulate access, and potential <br /> construction or demolition as necessary for the construction of piping to the curb inlets and/or the pipes <br /> connecting the curb inlets to the underground structure, and/or the underground structure itself. The <br /> easement will provide for perpetual maintenance, repair and replacement of any piping or facilities <br /> constructed by Seller and will limit the impervious surface area on New Lot 1 that is supported by or <br /> otherwise flows into the underground detention facility to an amount not to exceed 1.59 acres. It is <br /> understood and agreed that the underground detention facility is only designed to accommodate 1.59 <br /> acres of impervious surface coverage from New Lot 1. The general description of the easement location <br /> will be: starting where the eastbound private road leaves the public right-of-way of the southbound <br /> entrance road, running 320' east. The Seller will hold the Buyer harmless from any liability related to <br /> Seller's construction of improvements necessary to utilize the permanent underground stormwater <br /> detention facility and Seller will be legally responsible to restore any damage the original condition of <br /> Buyer's facilities. The cost for repair and maintenance of the permanent underground detention facility <br /> shall be shared between the owners of New Lot 1 and Buyer's Parcel pro rata based on the square footage <br /> of impervious surface located on the respective parcels. The owner of New Lot 1 shall not be required <br /> to share in the repair and maintenance of the permanent underground detention facility until it receives <br /> a certificate of occupancy or certificate of completion for any structure located on New Lot I from the <br /> relevant governmental authority. Notwithstanding the foregoing, the Owner of New Lot 1 will <br /> exclusively maintain and repair any and all piping constructed by the Seller conveying stormwater from <br /> new Lot 1 to the permanent underground detention facility, and the owner of the Buyer's Parcel will <br /> exclusively maintain and repair any and all piping conveying stormwater from Buyer's Parcel to the <br /> permanent underground detention facility it constructs. <br /> b. Sediment Basin No. 1 (SBI) Temporary Erosion Control. The Declaration (with <br /> easements)will provide a temporary stormwater drainage easement in favor of the Seller to access SB 1 <br /> for the development of New Lot 1 (see Plan Set Sheet C2.1 of Exhibit A), and allow any and all <br /> necessary demolition and construction activities to make stormwater connection to SB 1. The easement <br /> will provide for perpetual maintenance,repair and replacement of any piping or facilities constructed by <br /> Seller for only so long as the temporary stormwater facility is in use during the construction on New Lot <br /> 1. Provided,however„if it is not technically feasible for Seller to connect to the permanent underground <br /> detention facility referenced in Section 2.a. above due to grade changes or other engineering <br /> impediments, Seller, shall have the right to convert SBI, to permanent stormwater detention facility. <br /> Should it be necessary for the Seller to convert SB 1 to a permanent facility, Seller shall bear costs of <br /> construction, operation, maintenance and repair to convert SB 1 to a permanent stormwater detention <br /> facility. The Seller will hold the Buyer harmless from any liability related to Seller's construction and <br /> operation of improvements necessary to utilize SB 1 as a permanent facility and Seller will be legally <br /> 2 <br /> 4918-0066-5674,v.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.