Browse
Search
Agenda 06-17-2025; 8-m - Amendment to the Purchase and Sale Agreement for the Property for the Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 06-17-2025 Business Meeting
>
Agenda 06-17-2025; 8-m - Amendment to the Purchase and Sale Agreement for the Property for the Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 10:25:36 AM
Creation date
6/12/2025 10:27:28 AM
Metadata
Fields
Template:
BOCC
Date
6/17/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-m
Document Relationships
Agenda for June 17, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 06-17-2025 Business Meeting
ORD-2025-022- Approval of Fiscal Year 2025-26 Budget Ordinances and County Fee Schedule
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-023-Fiscal Year 2024-25 Budget Amendment #11
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-055-Specialty Warranty Deed to Orange County
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-059-Approval of the Visitors Bureau’s FY 2025-26 Marketing Agreement with Clean, Inc
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-060- Approval of the Visitors Bureau’s FY 2025-26 Agreement with Media Two Interactive, LLC
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-061-Contract Renewal with Siemens for HVAC Controls and Building Automation Services for FY 2025-26
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-062-JCPC Certification and County Plan for FY 2025-2026
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-063-County funding Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-065- Approval of North Carolina Local Government Commission Audit Contract with Mauldin & Jenkins, LLC
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-024-Proclamation Honoring Jason Johnson as the 2025 Wells Fargo NC principal of the year
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-032-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br /> The developer shall record a public access easement and private R%MWAeeWe1etffent in <br /> each phase for all trails labeled "Walking & Bicycle Trail" on the approved Master Plan <br /> before the recordation of the final plat for the residential lots for that phase. <br /> b. The developer shall pave all trails labeled "Walking & Bicycle Trail" on the approved Master <br /> Plan unless a proposed trail is in an environmentally sensitive area (e.g., floodplains; <br /> wetlands; slopes exceeding 25%; highly erodible soils), in which case crushed stone or soft <br /> surfaces (e.g., natural earth; wood chips) may be used. All trails within the 12.8-acre <br /> conservation easement described in Section III above may be made of natural surfaces. The <br /> layout of trails shown on the Master Plan is conceptual. Exact trail locations and surfaces <br /> will be established during site plan/construction drawing review. <br /> c. All trails shall be maintained in perpetuity by the developer, any successors and assigns of <br /> the developer, or other acquiring parties. The Town shall not be responsible for trail <br /> maintenance. <br /> d. The developer shall install a sidewalk network interior to the site that connects with a <br /> sidewalk system on the west side of NC 86 S as shown on the Master Plan. <br /> e. The developer shall install a painted crosswalk with high-visibility striping and a flashing <br /> beacon at E. Scarlett Mountain Road and Storey Lane at the NC 86 S intersections if allowed <br /> and approved by the North Carolina Department of Transportation. <br /> f. The developer shall install a sidewalk on the east side of NC 86 S connecting to said <br /> crosswalk as shown on the Master Plan if allowed and approved by both the North Carolina <br /> Department of Transportation and the Orange County School Board. <br /> g. The developer shall design all streets designated as public on the Master Plan to NCDOT <br /> Subdivision Design Standards and Town of Hillsborough cross-sections as required by the <br /> town's Unified Development Ordinance. This design shall include, but shall not be limited to, <br /> the following: radii, vertical curves, storm drainage design, and gutter spread. The design <br /> speed will be consistent with current Town of Hillsborough ordinances. Curb and gutter will <br /> be required on all streets proposed for town acceptance but will not be required at the <br /> taper and turn-lanes at the intersection of NC 86 S and the development's entrance. <br /> h. The developer shall install all off-site improvements recommended by their Traffic Impact <br /> Analysis prepared September 19, 2023, and concurred with by NCDOT in its letter dated <br /> December 7, 2023. <br /> i. The developer shall update the Traffic Impact Analysis prior to the issuance of any Zoning <br /> Compliance Permits for Phase 2 to ensure acceptable operation at the various study <br /> intersections. If an updated Traffic Impact Analysis projects a Level of Service (LOS) of D or <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.